Similar Projects
Major Bridge P3
New Construction
Bidding

Major Bridge P3
New Construction
Bidding

Park Bridge Replacements
Post-Bid
Cecil, PA 15321

Request for Quotation - Materials Wheeling & Lake Erie Railway
Renovation
Post-Bid

Bridge Rehabilitation and Pavement Repairs
Results
PA

Berthel Avenue Bridge Scour Repair
Results
Washington, PA 15301

Mcclay Bridge Replacement Project
Renovation
Bidding
Washington, PA

Airport Road and Mulberry Hill Bridge Repair Projects
Post-Bid
Washington, PA 15301

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Bridge Repairs
New Construction, Infrastructure
Bidding

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

East Hillis Street
Results
$1,000,000 to $2,499,999 est. value
PA

Ridgewood Bridge Repair Project
Infrastructure
Post-Bid
Cecil, PA

PA 366 BR Over Pucketa Ck
Results
$1,000,000 to $2,499,999 est. value
PA

Construction of Valley High School Main Entrance Bridge
New Construction, Infrastructure
Post-Bid
New Kensington, PA 15068

Last Updated 07/30/2021 06:11 AM
Project Title

2021 On Demand Bridge

Physical Address View project details and contacts
City, State (County) (Fayette, Greene, Washington, Westmoreland Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge On-Demand Maintenance Of Various Structure Types Including But Not Limited To Structural Steel Repairs, Concrete Deck Repairs, Concrete Substructure Repairs, Bearing Repairs, And Scour Countermeasures Along With Other Miscellaneous Construction, As Indicated On The Attached Details Included In The Bid Package For Various State Routes, In Various Municipalities, In Fayette, Greene, Washington, And Westmoreland Counties 0201-0001lump Sum1.000 09na Clearing And Grubbing 0204-0100cubic Yard300.000 01**Nc1, s1, t1 Class 3 Excavation 0205-0292cubic Yard50.000 01**Nc1, s4 Structure Backfill 4205-0381ton200.000 01**Nyesc1proj Selected Borrow Excavation, Coarse Aggregate, No. 1 , Delivery Included 4205-0385ton200.000 01**Nyesc1proj Selected Borrow Excavation, Coarse Aggregate, No. 57 , Delivery Included 4205-0388ton50.000 01**Nyesc1proj Selected Borrow Excavation, Coarse Aggregate, No. 8 , Delivery Included 4205-0390ton300.000 01**Nyesc1proj Selected Borrow Excavation, Coarse Aggregate, No. 2a , Delivery Included 4212-0014square Yard1,000.000 01**Nyesc3, h, m2proj Geotextile, Class 4, Type a , Delivery Included 0460-0004gallon40.000 01**Nf4 Bituminous Tack Coat (Ntt/Cntt) 0609-0003lump Sum1.000 01**Nx Inspector`s Field Office And Inspection Facilities, Type b 0609-0009lump Sum1.000 01**Nxstd Equipment Package 0620-0500linear Foot350.000 01**Nj Reset Guide Rail 4626-0001cubic Yard40.000 01**Nyesm2proj Gabions, Type a Delivery Included 0845-0001dollar4,000.000$1.00$4,000.0001**Yc1, h, m2 Unforeseen Water Pollution Control 5001-1000cubic Yard80.000 01**Nyess9proj Class Aaap Cement Concrete Delivery Included 5001-1060cubic Yard80.000 01**Nyess9proj Class Aaa Cement Concrete Delivery Included 5001-1080cubic Yard80.000 01**Nyess2proj Class Aa Cement Concrete Delivery Included 5001-1120cubic Yard84.000 01**Nyess2proj Class a Cement Concrete Delivery Included 5001-1140cubic Yard50.000 01**Nyeskproj Class c Cement Concrete Delivery Included 5001-1160cubic Yard30.000 01**Nyess2proj Class Hes Cement Concrete Delivery Included 1002-0052pound290.000 09ns7 Reinforcement Bars, Epoxy Coated 1003-0005each32.000 09ns2 Dowel Holes, 12" Depth 1018-0050lump Sum1.000 09nt1 Removal Of Portion Of Existing Bridge 1019-0040square Yard12.000 09nk2 Protective Coating For Reinforced Concrete Surfaces (Penetrating Sealers, Reinforced Concrete Substructure Surfaces) 5040-0002square Foot300.000 01**Nyess9proj Concrete Bridge Deck Repair, Type 2 Includes Delivery, Testing, And Curing Materials 5040-0003square Foot200.000 01**Nyess9proj Concrete Bridge Deck Repair, Type 3 Includes, Delivery, Testing, And Curing Materials 1091-0331linear Foot20.000 09nk1 Epoxy Injection Crack Seal 9000-0001hour200.000 01**Nc1proj Hi-Lift, Rubber Tire Or Crawler Tractor, Size As Directed 9000-0002hour200.000 01**Nc1proj Tri-Axle Truck, 10 Cy 9000-0003hour200.000 01**Ns2proj Pick-Up Truck, 3/4 Ton 9000-0004hour200.000 01**Ns2proj Compressor, Size As Directed With Minimum 300` Airhose, 3/4" And Minimum Of Two 15 - 90 Lb Pnuematic Hammers As Directed 9000-0005hour300.000 01**Ns2proj Hydraulic Excavator, Truck Or Crawler Mounted, Up To And Including a 160 (Up To 20,000 Lbs), Bucket And Attachments 9000-0006hour300.000 01**Ns2proj Hydraulic Excavator, Truck Or Crawler Mounted, Up To And Including a 350 (20,000 To 100,000 Lbs), Bucket And Attachments 9000-0007hour85.000 01**Nc1proj Loader Backhoe, Rubber Tire, Size As Directed 9000-0008hour300.000 01**Nc1proj Single Axle Dump Truck 5 Cy Capacity 9000-0009hour100.000 01**Nc1proj Tandem Axle Flatbed Truck 9000-0010hour680.000 01**Ns2proj Miscellaneous Power Tools 9000-0011hour100.000 01**Ns2proj Weld Truck 9000-0012hour60.000 01**Ns7proj Flusher/Vacuum Truck 9000-0013hour100.000 01**Ns2proj Skid Steer Loader, Size As Directed 9000-0014hour60.000 01**Ns2proj Vertical Reach Manlift, Size As Directed 9000-0015hour200.000 01**Ns2proj Hydraulic Excavator, Truck Or Crawler Mounted, Over a 350 (Over 100,000 Lbs), Bucket And Attachments 9000-0016hour35.000 01**Ns2proj 60` Reach Under Bridge Snooper Crane 9000-0017hour16.000 01**Ns2proj 30 Ton, 80` Reach Crane 9000-0018hour16.000 01**Ns2proj 50 Ton, 80` Reach Crane 9000-0019hour16.000 01**Ns2proj Concrete Pump 3" Line With Minimum 150` Of Line 9000-0020hour16.000 01**Ns2proj 1/2 Cy Portable Concrete Mixer 9000-0021hour200.000 01**Ns2proj 5000 Watt Generator With Small Hand Tools 9000-0023dollar8,400.000$1.00$8,400.0001**Yc1, h, m2proj Temporary Water Diversion 9000-0029dollar225,000.000$1.00$225,000.0001**Ys2proj Unforeseen Equipment, Labor And Materials 9000-0031hour32.000 01**Nc1proj Hi-Lift, Rubber Tire Or Crawler Tractor - Standby, Size As Directed 9000-0032hour32.000 01**Nc1proj Tri-Axle Truck, 10 Cy Standby 9000-0033hour40.000 01**Ns2proj Pick-Up Truck, 3/4 Ton, Standby 9000-0034hour200.000 01**Nc1proj Hydraulic Excavator, Truck Or Crawler Mounted, Over a 350 (Over 100,000 Lbs), Bucket And Attachments - Standby 9000-0035hour200.000 01**Nc1proj Hydraulic Excavator, Truck Or Crawler Mounted, Up To And Including a 160 (Up To 20,000 Lbs), Bucket And Attachments - Standby 9000-0036hour200.000 01**Nc1proj Hydraulic Excavator, Truck Or Crawler Mounted, Up To And Including a 350 (20,000 To 100,000 Lbs), Bucket And Attachments - Standby 9000-0037hour24.000 01**Nc1proj Loader Backhoe, Rubber Tire, Size As Directed - Standby 9000-0038hour40.000 01**Nc1proj Single Axle Dump Truck, 5 Cy Capacity - Standby 9000-0039hour40.000 01**Ns2proj Tandem Axle Flatbed Truck - Standby 9000-0040hour200.000 01**Ns2proj Compressor, Size As Directed With Minimum 30` Airhose, 3/4" And Minimum Of Two 15 - 90 Lb Pnuematic Hammers As Directed - Standby 9000-0041hour16.000 01**Ns2proj Weld Truck, Standby 9000-0042hour16.000 01**Ns2proj Flusher/Vacuum Truck, Standby 9000-0043hour64.000 01**Ns2proj Skid Steer Loader, Size As Directed, Standby 9000-0044hour20.000 01**Ns2proj Vertical Reach Manlift, Size As Directed - Standby 9000-0046hour12.000 01**Ns2proj 60` Reach Under Bridge Snooper Crane, Standby 9000-0047hour12.000 01**Ns2proj 30 Ton, 80` Reach Crane, Standby 9000-0048hour12.000 01**Ns2proj 50 Ton, 80` Reach Crane, Standby 9000-0049hour12.000 01**Ns2proj Concrete Pump 3" Line With Minimum 150` Of Line, Standby 9000-0050hour12.000 01**Ns2proj 1/2 Cy Portable Concrete Mixer, Standby 9000-0051hour32.000 01**Ns2proj 5000 Watt Generator With Small Hand Tools, Standby 9000-0052hour100.000 01**Ns2proj 3" Water Pump 9000-0053hour100.000 01**Ns2proj 6” Water Pump 9000-0054hour96.000 01**Ncproj Compaction Equipment 9000-0055hour16.000 01**Ns2proj Magnetic Drill 9000-0056ton200.000 01**Nc1proj Rock, Class r-3, Delivery Included 9000-0057ton200.000 01**Nc1proj Rock, Class r-4, Delivery Included 9000-0058ton200.000 01**Nc1proj Rock, Class r-5, Delivery Included 9000-0059ton200.000 01**Nc1proj Rock, Class r-6, Delivery Included 9000-0060ton200.000 01**Nc1proj Rock, Class r-7, Delivery Included 9000-0061ton200.000 01**Nc1proj Rock, Class r-8, Delivery Included 9000-0070hour3,000.000 01**Ns2proj Laborer - Regular Time 9000-0071hour200.000 01**Ns2proj Laborer - Premium Time 9000-0072hour600.000 01**Ns2proj Foreman - Regular Time 9000-0073hour32.000 01**Ns2proj Foreman - Premium Time 9000-0074hour800.000 01**Ns2proj Carpenter - Regular Time 9000-0075hour40.000 01**Ns2proj Carpenter - Premium Time 9000-0076hour100.000 01**Nsproj Cement Finisher - Regular Time 9000-0077hour16.000 01**Ns2proj Cement Finisher - Premium Time 9000-0078hour100.000 01**Ns2proj Welder - Regular Time 9000-0079hour16.000 01**Ns2proj Welder - Premium Time 9000-0080hour80.000 01**Ns2proj Iron Worker - Regular Time 9000-0081hour8.000 01**Ns2proj Iron Worker - Premium Time 9000-0082hour40.000 01**Ns2proj Engineer - Regular Time 9000-0083hour200.000 02**Nqproj Flagger - Regular Time 9000-0084hour40.000 02**Nqproj Flagger - Premium Time 9000-0085hour500.000 01**Nc, c1, s2, t1, t3proj Heavy Equipment Operator - Regular Time 9000-0086hour24.000 01**Nc, c1, s2, t1, t3proj Heavy Equipment Operator - Premium Time 9000-0094hour50.000 02**Nqproj Shadow Vehicle 9000-0095day24.000 02**Np8, Qproj Portable Three Line Changeable Message Sign 9000-0096dollar10,000.000$1.00$10,000.0002**Yqproj Required Traffic Control Signs And Devices 9000-0097square Foot500.000 02**Nqproj Additional Traffic Control Signs 9000-0098dollar10,000.000$1.00$10,000.0002**Yqproj Unforeseen Traffic Control 9000-0099hour40.000 02**Nqproj Portable Light Plant 9000-0100dollar10,000.000$1.00$10,000.0002**Yxproj Railroad Involvement 9000-0101linear Foot300.000 01**Nc1, s5proj Temporary Excavation Support And Protection System 9000-0102each20.000 02**Nqproj Installation And Removal Temporary Steel Roadway Plate

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents