Similar Projects
Justice Center Tunnel Flooring Replacement
Post-Bid
Fayetteville, GA 30214

GGC Building F- Gym Floor Replacement
Post-Bid
Lawrenceville, GA 30043

Replace Gym Flooring at an Elementary School
Results
Saint Simons Island, GA 31522

Detention Center Flooring
Results
Dahlonega, GA 30533

72--Epoxy Garage Flooring
Post-Bid
Fort Benning, GA

Sheriff`s Administration Building Flooring Replacement
Results
Augusta, GA 30901

Demand Services Contract for Flooring and Carpet On-Call Contractors
Post-Bid
Gainesville, GA

Lou Walker Senior Center Locker Room Floor Replacement
Results
Lithonia, GA

Luxury Vinyl Flooring Installation
Post-Bid
Cedartown, GA

Remove Carpet and Replace Tile
Results
Cumming, GA 30040

LVT and Carpet Replacement Installation at Marietta Fire Department Station #51
Post-Bid
Marietta, GA 30061

Fire Station 10 Flooring and Painting
Results
Fayetteville, GA 30215

Flooring Improvements To The Deed Room
Post-Bid
Sandersville, GA

MXG Carpet
Results
Moody AFB, GA 31699

Acworth Municipal Detention Center Flooring Contract
Post-Bid
Acworth, GA 30101

Reported 07/09/2020 12:00 AM
Project Title

78--Outdoor Training Facility Turf and Fitness Rig

Physical Address View project details and contacts
City, State (County) Savannah, GA 31409   (Chatham County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The MICC End User requires the following items, Brand Name or Equal, to the following: LI 001: 5mm Foam Backed Turf. 65 feet by 70 feet Must have custom design, see attached. Must include 24x Rubber Doorway Transitions 1/2" to flush 4" x 12', 1, EA; LI 002: 4-gallon E-Drip Adhesive, 13, EA; LI 003: 12mm ShockPad - proportion 4:6 and threelayer composite technology. •Material-environmental protection resin and rubber foam, rubber has a strong tensile strength and softness, which ensure the strong elasticity and softness brings sense of comfort at the same time. The UV resistant film, environmentally friendly, no odor. •Cutting technology---Cutting grooves vertically and horizontally with holes to make sure water drainage in four directions, and installation more even. •Tensile strength---Three-layer structure and characteristics of rubber makes the shock pad with the strong tensile strength, which will protect the product from deformation and damage during the installation. Tensile strength of one-time forming process product is poor. Structure Three layers Material Easy to handle Thickness 12mm Length Tailored for pitch Width 1.5 meter Installation guide Yes Drainage Good Flame retardant Yes, 4892, EA; LI 004: Installation of Turf, 1, EA; LI 005: Outdoor Fitness System Length cannot be more than 70 feet. System will come in 3x separate "systems". Width cannot total in more tan 65 feet. All systems must be compatible with each other and interchangable. • 3x Up and Down Monkey Bar Climbing Sections (minimum 40ft length each) • 30x Olympic Lifting Stations (shall be outside of the central corridor of Monkey Bar Sections) • 90x Pull-up stations • 36x Wall ball targets • 30x J-Cup sets (Sandwich Style) • 6x Rope Climb Tower • 12x Olympic Ring Stations • 24 Contact points for TRX system (in-between workout stations) Materials: • Minimum 3"x3" 11 gauge A500 US-made structural grade steel. Minimum 70,000 psi mig welds that are finished smooth. All connection points must be capped and affixed via grade 5 all weather attachment bolts with anti-vibration lock systems. • All OWS structure shall be rated for outdoor use (Rain and sun exposure) • Galvanization - All steel is smooth (de-burred), free of defects, indentations and rust. Steel parts are finished by grinding outside edges and corners, sand blasted and phosphatized. Steel parts are then electro-galvanized with zinc coating prior to powder coating to ensure an all-weather finish. • Must be Powder-Coated with ASTM certified TGIC powder coat paint, electrostatically applied in an atmospherically controlled powder coat booth to a thickness of no less than 3 MILS. Coated steel is then oven baked at 400 degrees for 30 minutes to ensure uniform, durable, high-quality finish. Warranty: • Lifetime Warranty on all structural steel material, equipment frames, and welding integrity. Warranty must cover replacement of defective products/parts, supply return packaging and shipping or cover on-site labor costs provided by a certified Equipment Repair, 1, EA; LI 006: Installation of Outdoor Fitness System, 1, EA; LI 007: Delivery to 31409, 1, EA;

Details

Division 09 - Finishes, Flooring, Specialty Flooring, Synthetic Turf Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents