Similar Projects
Purchase and Installation of an Emergency Generator
Results
Valparaiso, FL

Emergency Portable Generators
Term Contract
Results

Annual Maintenance and Repair of Emergency Generators
Term Contract
Post-Bid
Baker, Crestview, Destin, Fort Walton Beach, Shalimar, FL 32536

Specifications For Electrical Construction Repair To Damaged Utility Lines In Post Disaster Environment
Post-Bid
Moore Haven, FL

Bldg 90758 Upgrade Electric, Safety and Security
Term Contract
Post-Bid
$500,000 to $1,000,000 est. value
Hurlburt Field, FL

Genie Air Lift Repair
Term Contract
Post-Bid
Hurlburt Field, FL

Hanger Fans
Term Contract
Post-Bid

NPS, Liebert UPS Semi Annual Maintenance
Term Contract
Results
Homestead, FL 33030

MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Post-Bid
Less than $20,000,000 est. value

Repair Generators Multi (Buildings) Hurlburt Field
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
Hurlburt Field, FL 32544

Electrical Grounding for Riverside Elementary School
Alteration
Results
Crestview, FL 32539

Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

Storm Rates Overhead Line Construction 2022
Infrastructure
Post-Bid

Electric Motor Repair/Service/Replacement for the Water and Sewer Department
Alteration
Results
Crestview, FL

Generator-Auxiliary Engine Inspection, Testing, Maintenance and Repair Services
Term Contract
Bidding

Last Updated 04/01/2022 03:33 PM
Project Title

Power Converter Installation

Physical Address View project details and contacts
City, State (County) Eglin AFB, FL   (Okaloosa County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This statement of work is for installation of a 400 Hertz converter installation for the Guided Weapons Evaluation Facility (GWEF), 782 Test Squadron/RNWG, Eglin AFB, FL. The new 400 Hertz converter will be provided by the GWEF. The Contractor shall be required to furnish all materials, equipment, labor and personnel necessary to accomplish this work in accordance with the contract requirements. The Contractor is expected to maintain safety requirements and demonstrate standard construction methods, at all times. The contractor shall perform all work listed below: A. Disconnect and remove existing 40A circuit feeding previous converter. B. Disconnect and remove existing converter output circuit. C. Install (1) 125A 3 pole 480V circuit breaker in existing Siemens FC1 switchboard. D. Install (1) input circuit from existing switchboard to new converter terminating on input circuit breaker within the converter. E. Install a 600A rated parallel output circuit from the converter to its load termination (this circuit capacity is based upon the output circuit breaker size within the new converter). F. Install (1) lot conduit, boxes, hardware, conductors and misc. hardware to install the above referenced items. G. Install a new user-provided 400 hertz power converter. The unit is replacing an old converter that has already been removed. H. Disposal of any waste generated by the installation

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents