Similar Projects
SR 64 Mixed Use Project
New Construction
Conception
$140,000,000 est. value
Bradenton, FL 34212

Lakeside Plaza
Demolition, New Construction, Infrastructure - 66,738 SF
Conception
$11,000,000 CJ est. value
Bradenton, FL 34207

Blue Heron Preserves at Magnolia Lakes
New Construction
Design
Bradenton, FL

Reimagining Pine Avenue Safety Improvement Project - City of Anna Maria
Infrastructure
Design
$1,360,000 CJ est. value
Anna Maria, FL 34216

Orange on 14th Street
New Construction
Post-Bid
Bradenton, FL 34205

interior modernization of our public housing units
Renovation
Post-Bid

Low Bid Design Build I-275 At Skyway Attenuation
Infrastructure
Results
FL

Asphalt and Sidewalk Rehabilitation
Infrastructure
Results

Reef at Riviera
New Construction - 255,000 SF
Construction
$25,000,000 est. value
Palmetto, FL 34221

Nine20 Manatee West
New Construction - 152,209 SF
Construction
$10,000,000 CJ est. value
Bradenton, FL 34205

Whitfield Preserve
New Construction
Pending Verification
Sarasota, FL 34243

Lakewood Ranch Multifamily Phase 2
New Construction, Infrastructure
Pending Verification
$117,000,000 CJ est. value
Bradenton, FL 34211

Harbor Hills Water Main Replacement - 6104270 - Manatee County
Infrastructure
Conception
$3,774,000 CJ est. value
Bradenton, FL 34209

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

RFP Engineering - SR 55 (US 19) From Terra Ceia Rd to I-275
Infrastructure
Post-Bid
$15,847,904 CJ est. value
Inglis, FL 34449

Last Updated 06/29/2023 01:03 PM
Project Title

Bryant Commons Apartments

Physical Address View project details and contacts
City, State (County) Bradenton, FL 34208   (Manatee County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction
Contracting Method Bids by Invitation
Project Status Abandoned, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a senior apartment building. As of June 29, 2023 the project has been cancelled.

Details

3 Stories Above Grade, New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents