Similar Projects
Last Updated | 05/06/2022 12:48 AM |
Project Title | Repair to Existing Damage to Wall Panels in the Length of the Ejmt North Tunnel |
Physical Address | View project details and contacts |
City, State (County) | (Clear Creek, Summit Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Eisenhower Johnson Memorial Tunnelrepair To Existing Damage To Wall Panels In The Length Of The Ejmt North Tunnel (Mp 213.651-Mp 215.348). Project Is Meant To Repair/Reset The Shims, Grout Bed, And Shifted Wall Panels That Have Deteriorated Over Time Due To Excessive Moisture And Ice On The Walls Of The Bore. Major Items 202-00503 Removal Of Portions Of Present Structure 65.000 Sy 210-00001 Reset Structure 12.000 Each 626-00000 Mobilization 1.000 l s 630-00000 Flagging 500.000 Hour 630-00001 Pilot Car Operation 550.000 Hour 630-00006 Uniformed Traffic Control (Vehicle) 200.000 Hour 630-00007 Traffic Control Inspection 80.000 Day 630-00012 Traffic Control Management 70.000 Day 630-85041 Mobile Attenuator 40.000 Day 630-86810 Traffic Signal (Temporary) 2.000 Each 632-00000 Night Work Lighting 1.000 l s |
||||||
Details | Dam/Tunnel, New Construction.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |