Similar Projects
South Haven Development
New Construction
Conception
Lindon, UT

Halcyon Lake Estates - Phase II
New Construction
Conception
Ogden, UT 84401

Vistas at the Point
New Construction - 249,200 SF
Design
$10,000,000 CJ est. value
Lehi, UT 84043

Olympia Hills
New Construction
Design
Salt Lake City, UT 84190

Housing Rehabilation Construction Services
Bidding
Ogden, UT 84201

Housing Rehabilitation Construction Services
Bidding
Ogden, UT

Broderick Residence
New Construction - 5,100 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Orem, UT

Mitchell Grove Subdivision
New Construction - 277,364 SF
Post-Bid
Lehi, UT 84043

Z--Henry Mountain Field Station Housing Upgrades
Results
$250,000 to $500,000 est. value
Hanksville, UT 84734

Jarvie Ranger Residence Replacement
New Construction, Demolition
Results
$300,000 to $450,000 est. value
Dutch John, UT 84023

Creekside Manor Subdivision
New Construction - 24,576 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Farmington, UT 84025

Erin Hills Estates
New Construction
Construction
West Valley City, UT 84128

Gravel Pit and Development
Pending Verification
Willard, UT

860 Place
New Construction
Pending Verification
American Fork, UT

Medium Density Residential
New Construction
Conception
Salt Lake City, UT 84116

Last Updated 08/26/2020 07:05 AM
Project Title

DFCM Construction Pre-Qualified General Fountain Green Fish Hatchery Residence Renovation

Physical Address View project details and contacts
City, State (County) Fountain Green, UT 84632   (Sanpete County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $233,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project will consist of renovation work at three (3) Fish Hatchery Residences, the Main Fish Hatchery, and the Fish Hatchery Pump House. The Base Bid will consist of all of the work as outlined in the Plans and Specifications for the Base Bid.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents