Similar Projects
Indefinite Delivery Indefinite Quantity (IDIQ) Paving at Various Locations, Washington DC, MD, & VA
Design
Less than $75,000,000 est. value
Washington, DC

Surface Abrasion and Diamond Grinding of Roadways at Various Locations Statewide
Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value

MD Rt 80
Post-Bid
Urbana, MD 21704

Street Repair Services
Alteration
Post-Bid

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Catoctin High School Parking Improvements
Results
Thurmont, MD 21788

Woodlands At Urbana - Phase 3 Roads
Construction
Urbana, MD

Woodlands at Urbana - Phase 4 Paving
Construction
Urbana, MD

Bituminous Overlay of Various Frederick County Roadways (FY21)
Infrastructure
Post-Bid
$10,000,001 to $15,000,000 est. value
Frederick, MD 21709

Thurmont Food Bank Ingress/Egress
Results
Thurmont, MD 21788

Chip Seal of Various Frederick County Roadways
Results
$5,000,001 to $10,000,000 est. value
Frederick, MD 21701

Poplar Street Streetscape Improvements
Results
Myersville, MD 21773

Replacement and Repairs of Sidewalk and ADA Ramps of Various Frederick County Roadways (FY2021)
Results
$500,001 to $1,000,000 est. value
Frederick, MD 21701

Bennies Hill Road Deep Patch Repairs
Results
$100,001 to $500,000 est. value
Frederick, MD 21701

Urbana District Park New Parking Lot
Results
Frederick, MD 21701

Last Updated 08/31/2021 11:53 AM
Project Title

Monument Road Repaving at DNR Washington Monument State Park

Physical Address View project details and contacts
City, State (County) Middletown, MD 21769   (Frederick County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the Contractor providing all labor, equipment, materials, supplies, insurance, etc., necessary to resurface roads, parking lots, and office area at Washington Monument State Park.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents