Similar Projects
Medical Dental Office Building
New Construction - 15,840 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Atlanta, GA 30341

Emory Healthcare Medical Office Building
New Construction - 60,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Dunwoody, GA 30338

Fairfield Inn and Suites / Stone Mountain
New Construction, Infrastructure - 67,085 SF
Design
$10,000,000 CJ est. value
Stone Mountain, GA 30087

SR 10 / US 278 Fm CS 721 / Ashton Place to CR 5206 / Sams Crossing
Infrastructure
Design
$5,000,000 CJ est. value
Avondale Estates, GA 30002

Consent Decree - Find and Fix Assessment and Rehabilitation (CD - FFAR) (Multiyear Contract)
Infrastructure
Bidding
$2,000,000 CJ est. value
Decatur, GA 30030

Multi-Use Path, South Columbia Drive
Infrastructure
Bidding
$950,000 CJ est. value
Decatur, GA 30030

WD Thomson Park Drainage Improvements
Infrastructure
Post-Bid
$426,462 CJ est. value
Decatur, GA 30033

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Renovation of Tucker WIC Clinic
Renovation
Results
Tucker, GA 30084

Dresden Park Stream Bank Stabilization
Infrastructure
Results
$1,716,177 CJ est. value
Chamblee, GA 30341

Perimeter Marketplace
New Construction - 60,400 SF
Construction
Dunwoody, GA 30338

Atwood Chemistry Center 5th Floor Lab Renovation
Renovation - 2,822 SF
Construction
$448,000 est. value
Emory University, GA 30322

Lawrenceville Highway Townhomes
New Construction, Infrastructure
Pending Verification
$33,000,000 CJ est. value
Tucker, GA 30084

Park at Perimeter Center East Mixed-Use Development
New Construction, Infrastructure - 90,000 SF
Pending Verification
$200,000,000 CJ est. value
Atlanta, GA 30346

Lotus Grove
Demolition, New Construction, Infrastructure - 95,000 SF
Conception
$116,000,000 CJ est. value
Atlanta, GA 30340

Last Updated 01/27/2023 10:32 AM
Project Title

Decatur Laboratory Upgrades and Renovations - Georgia State Financing and Investment Commission

Physical Address View project details and contacts
City, State (County) Decatur, GA 30030   (DeKalb County)
Category(s) Heavy and Highway, Laboratory, Medical
Sub-Category(s) Laboratory, Medical Office/Outpatient, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected February 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $20,073,175 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Per the owner, as of January 27, 2023, the contractor has mobilized but has not broken ground yet. Closed solicitation is included below for reference. .................. STEP 1 The scope of the project will include the design and construction of a new Administrative and Training Building along with the renovation of the first and second floors of the existing laboratory building located on the DPH's campus in Decatur, Georgia. The new facility will be located on the East side of the campus. It is envisioned the new building will be a twostory structure with approximately 15,000 square feet of space to support a training area, offices, conference room, and flexible space for future needs. Roughly 30 parking spaces are also needed. Renovations to the existing laboratory building will include interior upgrades on the first and second floors. It is envisioned the renovation will include space for the following: o BSL-2 and BSL-3 areas o Diagnostic Testing o Sequencing/data analytics o Specimen receiving area o Conversion of existing lab space into a more modular based concept o Repurposing existing space to accommodate new operations o Modification to MEP systems as needed o Addition of a new elevator system that will enable DPH to isolate the transport of specimens between floors to the existing elevator. The renovations will also include modifications to systems to accommodate a new modular set up, not limited to brining gas/water/extraction from floor/walls to ceiling locations for flexibility. The design of spaces should also take into account chain of custody protocols. The preliminary stated (construction) cost limitation (SCL) for the Project is estimated to be $20,073,175.00. The final SCL may differ due to actual program requirements, funding, and other circumstances. Design professional services will begin in the first quarter of 2022 with the anticipated completion of the design by the end of 2022. Construction should start as soon as possible and may begin with the issuance of an early package for site or other components of the scope. Construction duration to reach Material Completion for the new building is estimated at approximately 10 to 11 months, with the entire scope of work for the new construction and renovation being completed not later than the end of June 2024 (All of the dates above are estimates which are subject to change.) Deadline for submission of written questions and requests for clarification (See 4. Submittals of Questions and Requests for Clarification below) 1/13/2022 2:00 PM . Questions about any aspect of the RFQ, RFP, or the project, shall be submitted in writing via e-mail to: Jeff Lacks, Director of Procurement Services 404-463-5740 jeff.lacks@gsfic.ga.gov STEP 2 The contract for Architectural and Engineering professional services will be generally based on the Design Professional Agreement for the Construction Manager as General Contractor Delivery located on the Georgia State Financing and Investment Commission website Deadline for finalist submission of written questions and requests for clarification 2/8/2022 2:00 PM Questions about any aspect of the RFP, or the project, shall be submitted in writing via e-mailto: Jeff Lacks, Director of Procurement Services 404-463-5740 jeff.lacks@gsfic.ga.gov

Details

2 Stories Above Grade, 15,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Laboratory Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Furnishings and Accessories, Seating, Institutional Furniture, Laboratory Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents