Similar Projects
Southern Oaks
New Construction
Conception
Narcoossee, Saint Cloud, FL 34771

Peninsula Bay - Master Plan
New Construction
Design
Cortez, FL 34210

The Wharf
New Construction - 11,982 SF
Design
$965,056 est. value
Saint Augustine, FL 32084

Tribute by Marriott
New Construction
Post-Bid
$12,000,000 est. value
Saint Augustine, FL 32080

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Post-Bid
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

Design-Build Construction Delivery Method for New Fire Stations
New Construction - 17,250 SF
Results
Jacksonville, FL

Trout River Floating Dock Demolition
Results
Less than $56,060 est. value
Jacksonville, FL

The Harbour in Historic Coconut Grove
New Construction, Renovation - 112,200 SF
Construction
$17,900,000 est. value
Coconut Grove, FL

North Cargo Berth 8 Extension
Construction
Less than $8,000,000 est. value
Cape Canaveral, FL 32920

DeSoto Park ADA Floating Kayak Launch
Post-Bid
Satellite Beach, FL 32937

Carl Gray Park Boat Ramp Improvements
Results
$250,000 est. value
Panama City, FL

Removal, Derelict Marine Vessels
Post-Bid
Less than $50,000 est. value
Tampa, FL 33601

Repair Waterfront and Storm Sewer Systems at U.S. Coast Guard Station Panama City, FL
Results
$500,000 to $1,000,000 est. value
Panama City, FL 32408

Black Point Marina - Dock Reconstruction
Post-Bid
Less than $804,000 est. value
Homestead, FL 33032

Design Build Services For Marine Projects- Annual Contract
Term Contract
Results
Jacksonville, FL 32099

Last Updated 04/02/2021 11:09 AM
Project Title

Beach End Walkover Maintenance

Physical Address View project details and contacts
City, State (County) Naples, FL   (Collier County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

33rd Ave South Beach End Walk Over. (Elevation change and replacement of all stringers, support beams, deck boards, top and side handrails) 1. Remove and replace all decking, top and side handrails. 2. New deck length to be approximately 24' with a slope no greater than 1:12. 3. Remove and replace (8) 6x6 posts. Install new posts 8' on center 4. Finished handrail height to be 36". 5. New walkway width to be no less than 5' between handrails. 18th Ave South Beach End Walk Over. (Replacement of all deck boards, stairs treads, top and side handrails) 1. Remove and replace all decking, top and side handrails. 2. Remove and replace stair treads. 15th Ave South Beach End Walk Over. (Elevation change and replacement of all stringers, support beams, deck boards, top and side handrails) 1. Remove and replace all decking, top and side handrails. 2. Gradually reduce elevation of walkway to eliminate 1 step. 3. Finished handrail height to be 36". 9th Ave South Beach End Walk Over. (Replacement of all deck boards, top and side handrails) 1. Remove and replace all decking, top and side handrails. 2. Remove and replace stair treads.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents