Similar Projects
Restore and Expand Cemetery
Results
Less than $1,000,000 est. value
Quincy, IL 62706

Danville National Cemetery - Shrine
Post-Bid
Danville, IL 61832

Bucaro Funeral Home
Addition
Construction
Bloomingdale, IL 60108

Marion Street Apartment Complex
New Construction, Demolition - 188,484 SF
Design
$10,000,000 CJ est. value
Oak Park, IL 60302

Requirement for Gravesite Maintenance. to Include Sod Placement, Gravesite Renovations and Headstone Placement
Design
Elwood, IL 60421

Hultgren Funeral Home
New Construction - 8,500 SF
Design
Carol Stream, IL 60188

Memory Garden
New Construction - 576 SF
Design
Less than $500,000 CJ est. value
Huntley, IL

Crematory and Parking Lot Expansion
Addition
Pending Verification
Elgin, IL 60123

Reported 09/16/2020 12:00 AM
Project Title

Fort Sheridan Shrine

Physical Address View project details and contacts
City, State (County) Sheridan, IL 60037   (La Salle County)
Category(s) Religious/Funeral
Sub-Category(s) Funeral Facility
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall furnish all equipment, parts, materials, labor and supervision necessary to fill, smooth, and grade the ground surface for drainage, to reestablish healthy turfgrass, reset upright headstones with corrected position and alignment, and to remove and plant trees at Ft. Sheridan National Cemetery, Vatner Road, Ft Sheridan, IL 60037. A.2 SCHEDULE OF SUPPLIES OR SERVICES: CLIN ITEM EST QTY UNIT UNIT PRICE TOTAL PRICE 1 Remove trees and their stumps (5 from center, 1 from north fence section 15) 6 Each 2 Kill and remove turfgrass from entire cemetery (progressively by section, as needed) 244,800 Sq. Ft. 3 Strip and stockpile top 8 inches of topsoil from non-burial center section, then replace it following addition and grading of new fill 66,800 Sq. Ft. 4 Supply clean soil fill to raise center section 5,100 Cubic Yards 5 Raise center section with supplied fill, compacted and graded at 2% slope for positive drainage 66,800 Sq. Ft. 6 Raise stormwater drains with adjustment rings to match new grade 6 Each 7 Prepare soil for and establish turfgrass with sod (progressively by section as other work is completed) 244,800 Sq. Ft. 8 Supply topsoil to fill and grade burial sections 5-16 1,800 Cubic Yards 9 Spread, grade and compact topsoil to form uniform surfaces with positive drainage in sections 5-16 178,000 Sq. Ft. 10 Reset headstones in burial sections 5-16 to corrected height, plumb, and alignment 2,400 Each 11 Clean headstones 2,400 Each  12 Plant trees (staked, mulched, with deer guards) 16  Each GRAND TOTAL AMOUNT = Note: Quoters will include a price for all Contract Line Item Number (CLIN s). Failure to submit a price for all items will be cause for rejection of offer.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Structural Concrete, Precast Structural Concrete, Grouting, Cementitious Grouting, Concrete Cutting.
Division 04 - Masonry, Common Work Results for Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Windows, Door Hardware, Window Hardware, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Flagpoles.
Division 11 - Equipment, Mortuary Equipment.
Division 12 - Furnishings, Art, Casework, Furnishings and Accessories, Rugs and Mats, Furniture.
Division 13 - Special Construction.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Sidewalks, Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Storm Drainage Utilities, Electrical Utilities, Electrical Utility Transmission and Distribution.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents