Similar Projects
Lake Murray Water Treatment Plant Filter 6 Addition
Post-Bid
$1,000,000 est. value
Lexington, SC 29072

Plum Island WPCP Phase 4 Capital Improvements Project
Post-Bid
$50,000,000 to $65,000,000 est. value
Charleston, SC 29401

Water Treatment Plant Basin Rehabilitation Project
Results
$350,000 est. value
Union, SC 29379

Highway 38 Well and Treatment Plant
Results
Bennettsville, SC

Breezy Hill/Charles A. Hilton Water Treatment Plant Expansion and Improvements
Addition
Construction
$2,000,000 est. value
Graniteville, SC

Clearwater Finishing Industrial Wwtp Demolition And Closure
Demolition
Construction
$800,000 est. value
Clearwater, SC

Surface Water Plant Filter Media Replacement
Post-Bid
Florence, SC 29506

Waccamaw Neck WTP Filter Valves Replacement
Results
Pawleys Island, SC 29585

Aerator Replacement Project
Post-Bid
Batesburg, SC

Waccamaw Neck WTP Flocculator Replacement Project
Results
Pawley's Island, SC

Screw Pump Replacement and Sludge Dewatering Improvements Project
Post-Bid
Batesburg, SC

Upper Wastewater Treatment Plant Aeration Improvements
Results
Saint George, SC 29477

Addie Road, Sudlow Lake Road And Connector Road Water Interconnections
Renovation, Alteration
Post-Bid
Graniteville, SC

Center Street Wastewater Treatment Plant Headworks Rehabilitation Project
Renovation
Results
Less than $2,168,000 est. value
Mount Pleasant, SC 29465

WTP Torque Tube Repair and Replacement
Alteration
Post-Bid
SC

Last Updated 10/07/2021 10:46 AM
Project Title

Plantation Pointe Pump Station

Physical Address View project details and contacts
City, State (County) Prosperity, SC   (Newberry County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a replacement for the existing Plantation Pointe duplex submersible wastewater pump station and related work. Also, demolition and removal of the existing pump station once the new station is in operation.

Details

Water Treatment Plant, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents