Similar Projects
Cooling Tower Replacement at Absegami High School and HVAC Replacement at Oakcrest High School
Alteration
Bidding
$1,275,000 est. value
Hamilton, NJ 08330

HVAC Maintenance Service Contract at the Belhaven Middle School and the Seaview Elementary School
Post-Bid
Linwood, NJ 08221

Chiller Maintenance Service Contract at the Belhaven Middle School and the Seaview Elementary School
Post-Bid
Linwood, NJ 08221

Remove and Replace HVAC/Furnace System at U.S. Coast Guard Absecon House
Results
Galloway, NJ 08205

On-Call HVAC Maintenance and Repairs
Results
Atlantic City, NJ 08401

Maintenance and Repair to the (BMS) Building Management System (ATC) Automatic Temperature Control (ECC) Energy Conservation Control System for Atlantic County Buildings
Post-Bid
Atlantic City, NJ 08401

HVAC and Building Mechanicals Maintenance Services National Aviation Research and Technology Park Building 3
Results
$17,820 est. value
Egg Harbor Township, NJ 08234

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC Contractor Services Repair and New Installation
Results
Atlantic City, NJ

Hydrogen Peroxide Air Filtration & Disinfection Products
Post-Bid

Installation of Wall Mounted Replacement Air Conditioners/Heaters
Results
Buena Vista Township, NJ 08346

2021 HVAC Upgrades at Leeds Avenue School
Post-Bid
Pleasantville, NJ 08232

Chiller Replacement at Jordan Road School
Results
Less than $135,000 est. value
Somers Point, NJ 08244

Weatherization Energy Conservation Project 2021-2022
Post-Bid

HVAC Filter Service
Results
Pleasantville, NJ

Last Updated 03/03/2022 09:47 AM
Project Title

Air Handling Unit Replacement at Brigantine Community School

Physical Address View project details and contacts
City, State (County) Brigantine, NJ 08203   (Atlantic County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of (4) AHUs in select locations as indicated in the drawings and specifications. Replacement of an existing single exterior door to the roof with a double exterior door, including enlarging the masonry opening.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents