Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Pavement Rehabilitation
Infrastructure
Bidding
$3,750,000 est. value
AZ

Pavement Rehabilitation
Infrastructure
Bidding
AZ

Festival Ranch Parcel Q1 Phase 2 Concrete
Post-Bid
Sun City, AZ

Anthem at Merrill Ranch CFD 1, Phase XX -Constitution Way/National Way Concrete, Paving and Landscape
Post-Bid
Florence, AZ

Pinnacle Peak Road 45th Avenue to 35th Avenue Paving and Storm Drain Improvements
Results
$9,000,722 est. value
Glendale, AZ 85310

North Garden Avenue and Fry Boulevard Improvements
Results
$2,200,000 to $2,400,000 est. value
Sierra Vista, AZ

Costco #407 Entry Drive Widening
Renovation
Construction
Tucson, AZ 85712

Jackrabbit Crossing - West Indian School Road Eastbound Half Street Improvements, West Of North Jackrabbit Trail
Infrastructure
Construction
$1,275,000 est. value
Phoenix, AZ 85042

Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

Hot Asphaltic Concrete Pavement Overlay
Infrastructure
Bidding
Holbrook, AZ

Research on the Impact of Diamond Grind Pavement Resurfacing on PM-10 Emissions
Term Contract
Post-Bid
AZ

Haekel Road Cold Patch Asphalt 2019
Results
Safford, AZ

Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Last Updated 03/08/2022 11:15 AM
Project Title

35th Avenue and Harrison Street UPRR Railroad Crossing Design-Bid-Build

Physical Address View project details and contacts
City, State (County) Phoenix, AZ   (Graham County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This street improvement project will enhance the safety of the Burlington Northern-Santa Fe (BNSF) Railroad crossings at the intersection of 35th Avenue and Harrison Street. The roadway improvements are at the approaches on both sides of the railroad tracks at the intersection. The project includes new curbs, gutters, sidewalks, ramps, and pavement restoration in addition to upgrading traffic signals at the intersection and installing new cantilevers with gate arms. This project follows the Federal Highway Administration Section 130 program with the intent to improve vehicular and pedestrian safety at the railroad crossings

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents