Similar Projects
Sewer Root Control Treatment
Term Contract
Post-Bid
Saint Charles, IL 60174

2021 Water & Sewer Division Emergency Repair
Term Contract
Post-Bid
Aurora, IL 60505

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Route 31 Water Main Relocation - Phase 2
Results
$1,000,000 to $2,000,000 est. value
South Elgin, IL 60177

2021 Fire Hydrant Sandblasting and Painting Project
Post-Bid
Carpentersville, IL

2020 Sanitary Sewer Cured-in-Place Pipe Lining
Results
Less than $250,000 est. value
Carpentersville, IL 60110

2021 Sanitary and Storm Sewer Lining - C.I.P.P
Post-Bid
Batavia, Saint Charles, IL

2020 Miscellaneous Sewer Improvements
Results
Elgin, IL 60120

2021 Street and Watermain Improvements
Post-Bid
Geneva, IL

Illinois Route 25 Force Main Relocation
Results
South Elgin, IL 60177

2020 Sanitary Sewer CIPP Lining
Results
Less than $1,105,662 est. value
Aurora, IL 60505

Backflow Testing And Repairs
Results
Elgin, IL 60120

2020 High Capacity Inlet Replacement Program
Results
Carpentersville, IL

Geneva East Sanitary Sewer Rehabilitation
Results
$675,000 to $800,000 est. value
Geneva, IL 60134

2021 Sanitary And Storm Sewer Televising Contract
Results
Less than $164,760 est. value
Aurora, IL

Last Updated 03/26/2021 05:09 PM
Project Title

Trunk Sewer Main Replacement

Physical Address View project details and contacts
City, State (County) Saint Charles, IL   (Kane County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of approximately 3,600 feet of 21-inch sanitary sewer and 2,100 feet of 8-inch water main and related appurtenances including paving and drainage improvements. The sanitary sewer improvements are located on Roosevelt Street from Elm Street to IL Rte 31 and on IL Rte 31 from Roosevelt Street to Mosedale Street. The water main improvements are located on Roosevelt Street from Elm Street to IL Rte 31.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents