Similar Projects
N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

N--Butterfly Valve Replacement - Blue Mesa Powerplant
Design
$5,000,000 to $10,000,000 est. value
Montrose, CO

Courthouse Gas Boiler Replacement
Alteration
Bidding
Central City, CO 80427

Chiller Services
Term Contract
Bidding
Thornton, CO

FCF Boiler Number 1 Equipment Bid Pack 1
Post-Bid
Less than $800,000 est. value
Canon City, CO

DWCF LU5 Steam Converter Replacement
Post-Bid
Less than $115,000 est. value
Denver, CO 80239

AFB 2141 CC 2018 Hail Damage Repairs
Results
$3,800,000 to $4,300,000 est. value
Colorado Springs, CO

Mechanical, Electrical & Plumbing Construction Services
Results
Golden, CO 80401

Standing Order Contractor - Boiler Services
Alteration
Bidding
Bellvue, CO

Boiler Replacement for Mesa Elementary School
Post-Bid
Westminster, CO 80031

Replace Mechanical System and Upgrade Controls for Harmony Library LC
Results
Fort Collins, CO 80526

Cheltenham Mechanical and Electrical
Alteration
Bidding
Denver, CO 80204

Full-Service Mechanical Maintenance
Post-Bid
Denver, CO

Boilers 1, 3, 4, Terminal and Aob Pump Rooms Replacement
Results
Denver, CO 80249

Heating Boiler System at Building Ec-8 at Curecanti National Recreation Area
Alteration
Bidding
$100,000 est. value
Gunnison, CO 81230

Last Updated 04/20/2022 10:24 AM
Project Title

Franklin Middle School Chiller Plant Replacement

Physical Address View project details and contacts
City, State (County) Greeley, CO 80634   (Weld County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and dispose of (1) existing York 140 ton liquid cooled chiller. Remove and dispose of (1) BAC Cooling tower, associated piping, and all unnecessary material. Provide and install (1) One York YCWL Chiller (140 tons nominal), as specified or District approved equal. Provide and install (1) BAC Cooling tower as a one for one swap out with the original specified unit, model # VT0-102-L (see original attached submittal) Include all labor and materials necessary. Crane, rigging, and all necessary re-piping for chiller connection provided by the contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Packaged Water Chillers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents