Similar Projects
Reported | 04/19/2022 04:54 PM |
Project Title | Hatchery Well Pump and Motor Replacement |
Physical Address | View project details and contacts |
City, State (County) | Marseilles, IL 61341 (La Salle County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | |
Project Status | Abandoned |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Labor and equipment needed to remove and replace the existing 15 HP 230V 3 phase 6” Franklin electric motor and 15 HP Grundfos 85s150-13 phase Pump end which is past normal life expectancy, installation of two 3 inch stainless steel check valves, 450 ft of 6/3 flat jacketed pump cable, all materials for pump connection, testing of new equipment, programming of VFD and well disinfection. The existing pump is set at 440 ft on 3-inch stainless steel drop pipe. New Pump and motor must be compatible with Titan P series (Franklin Electric) variable frequency drive (VFD). Vendor is responsible for programming VFD to operate pump and motor correctly. The existing pump and motor will stay in the possession of the Fish Hatchery staff once removed. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |