Similar Projects
Melvin Price Lock & Dam Reach 2 Flood Control Relief Wells
Alteration
Design
Alton, IL 62002

Water System Improvements Division 1 Well Building and Aerator Replacement
Infrastructure
Bidding
Macon, IL

Well 3 Water Main Reconfiguration
Infrastructure
Bidding
$300,000 est. value
Monee, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Replacement of Media in the Iron Filter at Well 5
Infrastructure
Bidding
$392,000 est. value
Fox Lake, IL

Purchase of Valves and Actuators for Wells 10 and 16
Post-Bid
Crystal Lake, IL

Screw Pump Installation
Results
Less than $75,000 est. value
Granite City, IL 62040

South Fork Pumps
Infrastructure
Bidding
Springfield, IL

Alaris IV Pumps
Post-Bid
Chicago Heights, IL

Concrete Repair and Epoxy Coating of Wet Wells and Screen Channels
Results
Less than $840,000 est. value
Gurnee, IL 60031

Procurement Services Office
Post-Bid
Naperville, IL

Mainstream Tarp Pumps Rehabilitation
Results
$19,484,000 to $23,585,000 est. value
Hodgkins, IL 60525

Reported 04/19/2022 04:54 PM
Project Title

Hatchery Well Pump and Motor Replacement

Physical Address View project details and contacts
City, State (County) Marseilles, IL 61341   (La Salle County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Labor and equipment needed to remove and replace the existing 15 HP 230V 3 phase 6” Franklin electric motor and 15 HP Grundfos 85s150-13 phase Pump end which is past normal life expectancy, installation of two 3 inch stainless steel check valves, 450 ft of 6/3 flat jacketed pump cable, all materials for pump connection, testing of new equipment, programming of VFD and well disinfection. The existing pump is set at 440 ft on 3-inch stainless steel drop pipe. New Pump and motor must be compatible with Titan P series (Franklin Electric) variable frequency drive (VFD). Vendor is responsible for programming VFD to operate pump and motor correctly. The existing pump and motor will stay in the possession of the Fish Hatchery staff once removed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents