Last Updated 05/29/2022 11:06 PM
Project Title

FY22 Utility Improvements Project

Physical Address View project details and contacts
City, State (County) East Lansing, MI 48823   (Ingham County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sanitary Sewers, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract shall be done in accordance with the Contract Documents and Construction Plans and shall generally include: furnishing of materials, labor and equipment for water main replacement, sewer replacement, curb and gutter replacement, driveway replacement, sidewalk replacement, HMA surface milling and HMA paving on Collingwood Drive, Kedzie Street, Division Street, Gunson Street and Sunrise Court as depicted on the plans. The project also includes traffic control, cleanup and restoration and all incidental work necessary to complete the project and provide a functional system.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents