Similar Projects
10th Street SE at Hull Avenue Storm Sewer Improvements
Conception
$1,846,900 est. value
Cedar Rapids, IA 52407

Storm Sewer Improvements
Conception
$2,000,000 est. value
Cedar Rapids, IA

Mount Pleasant Northeast Lagoon Conversion
New Construction, Infrastructure
Bidding
Mount Pleasant, IA

FY21 & FY22 Railroad Right of Ways & Sewer Manhole Rehabilitation
Infrastructure
Bidding
Davenport, IA

Street Repair Retainer
Term Contract, Infrastructure
Post-Bid
West Des Moines, IA

West Grand Business Park Grade, Pave, and Utilities
Infrastructure
Post-Bid
West Des Moines, IA 50266

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

22nd Street North East and B Avenue Intersection
Conception
$150,000 est. value
Cedar Rapids, IA 52402

Grand Avenue West Segment 4 Sewer Extension
Infrastructure
Bidding
West Des Moines, IA 50266

Riverfront/Downtown Revitalization
Renovation, Infrastructure
Post-Bid
$17,655,000 est. value
Burlington, IA

FY 2022 Pavement Patching
Results
$1,400,000 est. value
Cedar Rapids, IA

9Th Avenue South East Improvements from 3rd Road Street to Railroad
Conception
$200,000 est. value
Cedar Rapids, IA 52407

South East Crosswinds Drive RISE - Phase 2
Infrastructure
Bidding
Less than $2,780,342 est. value
Ankeny, IA 50021

South Grand Prairie Parkway - Stagecoach Drive to Grand Avenue
Infrastructure
Post-Bid
WDM, IA 50266

Last Updated 11/18/2021 03:18 PM
Project Title

East 7th Street Utility Improvements

Physical Address View project details and contacts
City, State (County) Monticello, IA   (Jones County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $260,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of approximately 500 SY of pavement, 500 LF of water main, 120 LF of sanitary sewer, 65 LF of storm sewer, 310 LF of sanitary pipe lining, along East 7th Street, from Cedar Street to North Sycamore Street in Monticello, Iowa. The utility improvements project generally includes utility improvements, associated pavements, sidewalk

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents