Similar Projects
OZFund Mixed Use Redevelopment
New Construction, Build-Out - 88,000 SF
Conception
$15,000,000 est. value
Lancaster, PA 17603

Fusting Executive Park - Phase 2 - DNA Corporate Office
New Construction - 80,000 SF
Conception
Murrysville, PA 15626

Spruce Street Mixed-Use Development
New Construction - 192,051 SF
Design
$75,000,000 est. value
Philadelphia, PA 19139

District Hall
New Construction - 225,000 SF
Design
$70,000,000 est. value
Pittsburgh, PA 15213

Dollar General Store #24067 / Ligonier
New Construction - 10,640 SF
Bidding
$1,800,000 est. value
Ligonier, PA 15658

Gilly Hicks #52338
Renovation
Sub-Bidding
$100,000 est. value
King of Prussia, PA 19406

AutoZone #1400
New Construction - 5,654 SF
Post-Bid
$500,000 to $1,000,000 est. value
Bethlehem, PA 18015

Shoe Dept. Encore
Renovation - 9,766 SF
Post-Bid
State College, PA 16803

Restoring The Study in the Historic Scheide House
Renovation - 216 SF
Results
$9,277 est. value
Titusville, PA 16354

Vehicle Maintenance Building - General Construction
New Construction - 29,450 SF
Results
$5,000,000 to $10,000,000 CJ est. value
Walnutport, PA 18088

The Mayer
New Construction - 6,650 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Bala-Cynwyd, PA 19004

2000 North Second Street
Addition
Construction
$1,000,000 est. value
Philadelphia, PA 19122

Taco Bell
New Construction, Demolition - 2,753 SF
Pending Verification
York, PA 17404

Vintage Business Park
New Construction - 25,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Paradise, PA 17562

Arencibia at Neighborhood 91 Manufacturing Hub
Build-Out - 10,000 SF
Conception
$1,800,000 est. value
Pittsburgh, PA

Reported 07/01/2022 12:00 AM
Project Title

Organic Snack Company

Physical Address View project details and contacts
City, State (County) Bedford, PA 15522   (Bedford County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant, Office, Retail
Contracting Method Construction Manager to Subcontract.
Project Status Sub-Bidding, Construction Start Expected second quarter 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager as Contractor (CMc)
Owner View project details and contacts
Architect View project details and contacts
Description

Local Sub-Contractors should contact Cameron Treat at Layton Construction for details on pre-qualification. The Organic Snack Company is currently in the Schematic Design Phase for a new ground-up Food Snack Production Facility which will include approximately : • 200,000 Square foot Insulated Concrete Tilt-Up single story warehouse for Receiving, Processing, Packaging, Fulfillment and Shipping • 40,000 SF two-story office to support administration, work spaces, and employee amenities • 4000 SF Retail Store • The developed area of the site is approximately 13 acres including the building, access roads, customer and employee parking, electric vehicle parking, receiving and distribution dock areas, landscaping, and an Organic Garden. Anticipated Construction Start is Spring/Summer 2023.

Details

244,000 SF - Retail, 1 Story Above Grade, 4,000 SF New Construction, Office, 2 Stories Above Grade, 40,000 SF New Construction, Manufacturing/Processing Plant, 1 Story Above Grade, 200,000 SF New Construction, 13 Acres.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents