Similar Projects
North East Yacht and North East 32nd to 30th - City of Lincoln City
New Construction, Infrastructure
Conception
$250,000 est. value
Lincoln City, OR 97367

Oregon Coast Aquarium Renovation Phase 2
New Construction, Renovation, Infrastructure - 10,650 SF
Design
$18,000,000 CJ est. value
Newport, OR 97365

New Rehabilitation Facility / The Oregon Coast Aquarium
New Construction, Infrastructure
Design
$9,750,000 CJ est. value
Newport, OR 97365

Schoolhouse Street Improvements
Infrastructure
Post-Bid
Depoe Bay, OR 97341

Sidewalk and Pedestrian Ramp Improvements
Infrastructure
Post-Bid
$140,000 est. value
Newport, OR

Skate Park Parking Lot
Infrastructure
Results
Lincoln City, OR

Southwest 63Rd And Southwest Inlet Avenue Overlay
Alteration
Results
$375,000 est. value
Lincoln City, OR 97367

US 101: Culverts (MP 73.46 - 136.29)
Infrastructure
Design
$4,365,000 CJ est. value
Yachats, OR 97498

L9 Pole Replacement Project
Infrastructure
Post-Bid
$622,000 CJ est. value
Newport, OR 97365

2022 East 2nd Street Improvements
Infrastructure
Results
$320,000 est. value
Yachats, OR 97498

US 101 Frontage Road: Ben Jones (Rocky Creek) Bridge
Infrastructure
Design
$6,172,100 CJ est. value
Newport, OR 97365

Yhona Overlook and Cobble Beach Stairs
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Newport, OR 97365

Northeast Williams Court - Water Line Project
Infrastructure
Results
$500,000 est. value
Lincoln City, OR

Jackson Toyota of Newport
New Construction, Infrastructure
Design
$5,902,000 CJ est. value
Newport, OR 97366

RFP Engineering - Construction and Engineering Services for Underground Construction - PacWave South
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Newport, OR 97365

Last Updated 05/01/2023 10:37 AM
Project Title

Crestline Drive Improvements

Physical Address View project details and contacts
City, State (County) Waldport, OR 97394   (Lincoln County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,194,700 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the following: Curb, sidewalk, and storm drainage improvements along the east side of Crestline Drive from Ball Boulevard to the Waldport High School Site (+-5,000 feet) including intersection pedestrian ramps. Curb, sidewalk, and storm drainage improvements along the north side of Range Drive from Crestline Drive to Master Street (+-700 feet). 6-inch diameter wastewater forcemain pipeline in Crestline Drive from Range Drive to the Waldport High School Site (+-3,500 feet). Engineer's estimate for base bid is $2,194,700. Engineer's estimate for Alternatives is $1,208,200

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents