Similar Projects
Replace/Repair Roofing Systems
Alteration
Design
$219,200 est. value

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Dickinson House Re-Roofing 2021
Results
Less than $65,000 est. value
Oglesby, IL 61348

PAV HA 6th Floor Lab - RO System Upgrade BP-02 (GC)
Alteration
Results
Lexington, KY 40506

Weatherization (IHWAP) Program
Term Contract
Post-Bid

HVAC Upgrades at Centennial Elementary School
Alteration
Results
Streator, IL 61364

2022 Mechanical Systems Improvements - Pre-Purchase
Alteration
Post-Bid
Ottawa, IL 61350

Seneca High School Cooling Upgrades 2022
Alteration
Results
Seneca, IL 61360

2022 HVAC Improvements - 1935 Gym
Alteration
Post-Bid
Marseilles, IL 61341

D3 Western Region Hvac Chapmans
Alteration
Results
Ottawa, IL

Replace/Repair Roofing Systems at Multiple Sites
Alteration
Post-Bid
Less than $250,000 est. value

2022 Mechanical Systems Improvements At Jefferson & McKinley Elementary Schools
Renovation, Alteration
Results
Ottawa, IL 61350

Performance Contracting Basis for Multiple Projects
Alteration
Post-Bid
Mendota, IL

2022 Electrical and HVAC Upgrades at Milton Pope School
Alteration
Results
$950,000 est. value
Marseilles, IL 61341

Last Updated 06/21/2022 09:18 AM
Project Title

Roofing and HVAC Project

Physical Address View project details and contacts
City, State (County) Ransom, IL 60470   (La Salle County)
Category(s) Single Trades
Sub-Category(s) HVAC, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Category Code: Buildings Rehabilitation/Renovation, Buildings and Grounds/Educational Facilities, Heating, Ventilation, Air Conditioning (HVAC), Construction, Mechanical Systems, Roofing, Painting, Windows 1. New Roof and New HVAC at the Elementary School. Scope for each project includes: a. Elementary School: New TPO Roofing and insulation over the 1951 original building excluding the gymnasium. b. Elementary School: New roof top units to provide heating and air conditioning for the gymnasium. c. Elementary School: Alternate to replace the glass block gymnasium openings with translucent panels.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents