Similar Projects
RFQ Engineering - Dam Safety Studies for the Sears and Steel Dams
Term Contract
Conception
Chicago, IL 60616

Beaver Lane (Wilmette Avenue to North End) - Village of Glenview
Infrastructure, Alteration
Conception
$309,600 est. value
Glenview, IL 60025

RFQ - I-80 Corridor Management from East of Ridge Rd to US 30, Phase III Construction Engineering Projects,
Term Contract
Design
Princeton, IL 61356

RFQ Engineering - Various Engineering Services, Bureau of Research
Term Contract
Design
Chicago, IL 60616

Snow Plowing Services
Term Contract, Infrastructure
Bidding
Oak Lawn, IL

2022 Paving Project (Re-Bid)
Infrastructure
Bidding
$390,000 CJ est. value
Oswego, IL 60543

Snow Removal Services for the 2022/2023 Snow Removal Season
Term Contract
Sub-Bidding
Lily Lake, IL 60151

Bituminous Materials
Term Contract
Sub-Bidding
$309,576 CJ est. value
Equality, IL 62934

Contractual Street Sweeping
Post-Bid
Vernon Hills, IL

Rend Lake Rest Area Maintenance
Term Contract
Post-Bid
Springfield, IL

Cleaning (Sweeping) Various Arterial Highways
Results

Cleaning (Sweeping) Various Arterial Highways
Results

RFQ - FAI 290 (Eisenhower Expwy) at Laramie Avenue, Phase II Engineering Project
Term Contract
Design
$15,099,000 CJ est. value
Chicago, IL 60624

Various Locations Drainage and Grading Improvements Project
Infrastructure
Bidding
$200,000 CJ est. value
Crete, IL 60417

Seal Coat (A-1)
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Granville, IL 61326

Last Updated 07/22/2022 06:02 AM
Project Title

RFQ - Various Phase II Traffic Signal Coordination and Timing (SCAT) Projects, Various Routes

Physical Address View project details and contacts
City, State (County) Springfield, IL 62703   (Sangamon County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Job No. S-60-001-23, Various Phase II Traffic Signal Coordination and Timing (SCAT) Projects, Various Routes, Various Counties, Districts Two, Three, Four, and Five, Bureau of Operations. The Complexity Factor for this project is 0.035. The Consultant who is selected for this project and all Subconsultants the Prime Consultant will be using are scheduled to attend an initial meeting on July 25, 2022, at 1:00 PM at the Central Bureau of Operations Office in Springfield. Phase II engineering services are required to ensure signal optimization is achieved at various isolated traffic signal and traffic signal system locations within Districts Two, Three, Four, and Five. Work Orders under the blanket agreement will be negotiated and authorized by the department on an as needed basis. The estimated engineering fee for this project is $300,000. The completion date for this contract will be a maximum of 36 months after authorization to proceed. The Prime firm must be prequalified in the Special Studies (Signal Coordination & Timing (SCAT)) category to be considered for this project. Statements of Interest, including resumes of the key people noted above, must be submitted electronically to the Central Bureau of Design and Environment through the Engineering Prequalification and Agreement System (EPAS). The firm acting as the prime must be prequalified in all the prequalification categories requested in the project advertisement even if they plan to subcontract part of the project, except where noted in a specific project advertisement. Any work being done by a consultant, prime or sub must be prequalified in the IDOT prequalification category of work they are performing. Questions concerning this Bulletin should be directed to: E-mail: DOT.ConsultantServices@illinois.gov Or mailing address: Bureau of Design and Environment 2300 South Dirksen Parkway Attn: Consultant Unit Room 330 Springfield, IL 62764 The method of contractor selection has not been determined at this time. IDOT - 048 - RFQ - Various Phase II Traffic Signal Coordination and Timing (SCAT) Projects, Various Routes

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents