Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

US-75A - Utilities
Alteration
Design
$326,144 est. value
Mounds, OK 74047

Mounds Town Hall
New Construction, Infrastructure
Bidding
$1,650,000 CJ est. value
Mounds, OK 74047

Liberty Park Pool Resurfacing
Infrastructure
Bidding
$200,000 CJ est. value
Sapulpa, OK 74066

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Emergency Waterline Repairs at Various Locations
Infrastructure
Post-Bid
Tulsa, OK

Water Castings, Manholes, Sealing Material and Anodes Water and Sewer Department
Alteration
Results
Tulsa, OK

Waterline Replacement
Infrastructure
Results
Tulsa, OK

Pavement Rehabilitation - SH 48
Infrastructure
Design
$5,450,000 CJ est. value
Bristow, OK 74010

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Safety Improvement
Infrastructure
Design
$3,501,080 CJ est. value
Sapulpa, OK 74066

Bristow Public Pool
Renovation, Infrastructure
Post-Bid
$400,000 CJ est. value
Bristow, OK 74010

Interchange - IS 44
Infrastructure
Design
$70,400,500 CJ est. value
Tulsa, OK 74131

Interchange - IS 44
Infrastructure
Design
$54,837,200 CJ est. value
Tulsa, OK 74131

Utilities - SH 48
Infrastructure
Design
$500,000 CJ est. value
Bristow, OK 74010

Last Updated 09/20/2022 09:41 AM
Project Title

Sapulpa Sports Complex Water Mitigation Project

Physical Address View project details and contacts
City, State (County) Sapulpa, OK 74066   (Creek County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Owner reserves the right to waive any informality or to reject any or all bids. The sealed proposal of each bidder shall be accompanied by a Noncollusion Affidavit, Business Relationship Affidavit, Experience and Equipment Questionnaire and a Certified or Cashier's Check or Bidder's Surety Bond in the sum of five percent (5%) of the amount of the bid will be required from each bidder to be retained as liquidated damages in the event the successful bidder fails, neglects, or refuses to enter into said contract for the construction of said public improvements for said project, and furnish the necessary bonds within ten (10) days from and after the date the award is made. Bids received more than ninety-six hours, excluding Saturdays, Sundays and holidays, before the time set for opening of bids, as well as bids received after the time set for opening of bids, will not be considered and will be returned unopened. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents