Similar Projects
Cronus Chemicals Fertilizer Plant
LEED Certification, New Construction, Infrastructure
Design
$1,762,000,000 CJ est. value
Tuscola, IL 61953

Furnish and Spread Bituminous Materials class A1
Infrastructure
Bidding
$2,000,000 CJ est. value
Tuscola, IL 61953

Furnish and Spread Bituminous Materials class A1
Infrastructure
Bidding
$2,000,000 CJ est. value
Tuscola, IL 61953

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Class A Pavement Patching in East Field Area for a Total Length of 30.54 MI
Infrastructure
Results

8.257 Miles of Smart Resurfacing from ECL of Arthur to US 45
Infrastructure
Results
Arcola, IL

Exterior Concrete Demo and Replacement: Douglas County Courthouse
Renovation, Infrastructure
Construction
$232,590 CJ est. value
Tuscola, IL 61953

The Construction of a Cape Seal, PCC Sidewalk, Sidewalk Removal
Infrastructure
Bidding
$100,000 CJ est. value
Camargo, IL 61919

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

CM Shoulder Repair from Vine St in Arthur to CR 100 E of Arthur
Infrastructure
Results
IL

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

2021 General Maintenance
Infrastructure
Results
Tuscola, IL

RFQ - Various Phase III Construction Inspection Projects, Various Routes, Various Counties
Term Contract
Post-Bid
Schaumburg, IL 60194

Tuscola Downtown Alley Improvements Phase 1
Infrastructure
Results
$635,255 CJ est. value
Tuscola, IL 61953

Last Updated 07/12/2023 02:03 PM
Project Title

Gallon Furnish and Spread Bituminous Materials

Physical Address View project details and contacts
City, State (County) Camargo, IL 61953   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of July 12, 2023, project was awarded to Mclain Site Solutions. , awarded amount is $ 72,501 .71 CANNOT FIND THE CONTRACTOR. City/County: Douglas Project consist of 37,000 Gallon Furnish and Spread Bituminous Materials, HFRS-2; 1,350 Ton, Furnish and Spread Aggregate Materials, CA-16, and other items of construction. Project Location: Various Township Roadways Proposals Requiring Prequalification of Bidders Will Be Issued Only to Those Contractors Who Are Qualified With the Department of Transportation. Prequalification Forms May Be Secured From the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, Il 62764. ILDOT - Gallon Furnish and Spread Bituminous Materials - 23-06000-00-GM

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents