Similar Projects
Y1da--674A4-21-001 Create Seclusion Rooms B94 (Padding)
Bidding
$25,000 to $100,000 est. value
Waco, TX 76711

Trinity Sealants and Exterior Repairs
Bidding
Austin, TX 78701

Clear Creek ISD Package 3 Vestibule Upgrades Project
Post-Bid
Columbus, TX

Drinking Fountain Replacement
Post-Bid
Less than $450,000 est. value
TX

CRF Awning
Results
$25,000 to $100,000 est. value
Fort Worth, TX

Shady Lane Lift Station Fall Protection
Results
Southlake, TX

Siding Replacement on Various Buildings at Hunnington and Raintree Apartments
Bidding
Waco, TX

Retaining Wall at Pieper Ranch Middle School
Post-Bid
Less than $980,000 est. value
San Antonio, TX 78260

50’ X 70’ X 12’ Tapered Beam Bolt Together Awning
Results
Petrolia, TX 76377

Van Horn Wall Finishing
Bidding
Austin, TX 78773

Replacement of Roof Vents, Gutters, Downspouts and Window Awnings
Post-Bid
Dallas, TX 75243

Gray Hall Vivarium Restoration
Results
Less than $909,000 est. value
Houston, TX 77004

Y1dz--Install and Provide Two Each 60` Flagpoles
Bidding
$25,000 est. value
Amarillo, TX 79106

ADA Handrail
Post-Bid
Fort Worth, TX 76116

Rusk State Hospital Ceiling Tile Replacement
Results
$60,000 est. value
Rusk, TX 75785

Reported 02/13/2021 12:00 AM
Project Title

Finish Out Inside of Modular Building

Physical Address View project details and contacts
City, State (County) Natalia, TX 78059   (Medina County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Finish out will include the following: Build at least four walls (ADA Restroom) and Storage closet with inside doors for both; insulation for the entire building; dry wall/tape/float/painting of building inside; finishing out of electrical (electrical wiring is already pre-installed with building) to include underground electric line from building to meter pole with 225-amp meter loop; connecting of water and sewer. Install ADA toilet and approved fixtures in restroom pus counter with sink in meeting room. Install vinyl or laminate flooring over sub-floor throughout. Install ADA ramp at entrance with appropriate landing; install skirting around building.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents