Similar Projects
Mountain Water Supply 30 Aerial Support Replacement
Infrastructure
Bidding
Greensburg, PA 15606

2020 Storm Water Improvement Project
Post-Bid
Bolivar, PA 15923

Furnish Ductile Iron Pipe
Term Contract
Post-Bid
New Stanton, PA 15672

Yukon Interchange (SR0070) Waterline Relocation
Results
Greensburg, PA

Penn Adamsburg Road Waterline Replacement Project
Results
Greensburg, PA 15601

Fusible and Restrained Joint PVC Pipe
Term Contract
Post-Bid
New Stanton, PA 15672

Apollo River Crossing Waterline Replacement
Results
Less than $886,688 est. value
Greensburg, PA 15672

Furnish Type K Copper Pipe
Post-Bid
New Stanton, PA 15672

Falcon Ridge Force Main Replacement
Results
$200,000 est. value
North Huntingdon, PA 15642

Furnish PVC Pipe
Term Contract
Post-Bid
New Stanton, PA 15672

SR119 J20 Waterline and Sewerline Relocation
Results
Greensburg, PA 15601

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

Millersdale Road Waterline Replacement Project
Results
PA

Flowers Road Pump Station Construction General/Mechanical
Post-Bid
Derry, PA 15627

Bel-Aire Pump Station Elimination
Results
Less than $118,835 est. value
Murrysville, PA 15668

Reported 05/11/2021 07:53 AM
Project Title

Jacobs Creek Watershed Association of Westmoreland County (Contract No. 21-Sw1)

Physical Address View project details and contacts
City, State (County) Scottdale, PA 15683   (Westmoreland County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contract No. 21-SW1 – Site No. 1 Improvements (Southmoreland High School Stormwater Improvements) generally consists of the construction of a rain garden / bio-retention area, also includes all associated site work including storm sewer (234 LF), paving restoration, landscaping; and all necessary appurtenances and restoration for said construction. Work includes, but is not necessarily limited to, the furnishing of all labor, superintendence, materials, tools and equipment and performing all work necessary to complete all General Construction in accordance with the Contract Documents.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents