Similar Projects
Last Updated | 03/27/2020 09:19 AM |
Project Title | Blossom Street and Winchester Court Sewer Main Replacement |
Physical Address | View project details and contacts |
City, State (County) | Keene, NH (Cheshire County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $720,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Blossom Street: 1. Replace approximately 1,726 linear feet of existing 10” Ac sewer main with 12” PVC SDR-35 pipe and install additional 715 linear feet of 12” PVC SDR-35 pipeto reroute the sewer main into the existing 18” AC sewer interceptor on Ridgewood Ave. 2. Remove thirteen (13) existing sewer manholes and replace with eight (8) new precast reinforced concrete manholes. 3. Replace twenty-nine (29) existing residential sewer services from the sewermain up to the property line with new 4” PVC SDR-35 pipe and cleanouts. Winchester Court: 1. Replace approximately 550 linear feet of existing 6” VC sewer main with 8” SDR- 35 PVC pipe, one precast concrete sewer manhole. Reconnect seven (7) existing residential sewer services. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |