Similar Projects
By-Pass Pumps Maintenance
Bidding
Davie, FL

Removal, Repair and Re-Installation of Two Vertical Single End Suction Axial Flow Pumps and Right-Angle Gear Drives
Post-Bid
Coral Springs, FL

Transfer Pump Replacement
Post-Bid
Less than $1,735,000 est. value
Hallandale, FL 33009

West Water Treatment Plant High Service Pumps MCC Replacement
Results
Less than $320,000 est. value
Deerfield Beach, FL 33441

Boesch Submersible Turbine Pump Model 10HxH-1C (1 Stage)
Term Contract
Results
$10,475 to $31,425 est. value
Hollywood, FL 33022

Flygt Pumps Replacement/Repair Services
Post-Bid
Miramar, FL

Rebuilding of Two (2) Stormwater Water Lubrication Pumps
Results
Hollywood, FL 33025

Mechanical Integrity Testing for Deep Injection Wells
Results
Miramar, FL 33027

Supply and Delivery of Two (2) Split Case Horizontal Pumps
Results
Plantation, FL 33317

Mechanical Integrity Testing (MIT), Sawgrass Water Treatment Plant (WTP) Concentrate Well CW1
Results
Sunrise, FL

Installation of Irrigation Pump System
Results
Miramar, FL 33025

Access Structure and Wetwell Rehabilitation - Term Contract
Term Contract
Results
Plantation, FL

Supply and Delivery of Well Pump
Results
Plantation, FL 33317

Raw Water Well #9
Results
Hallandale, FL 33009

Submersible Well Pump Motors, Pump Assemblies and Start-Up Services
Term Contract
Results
Less than $175,000 est. value
Fort Lauderdale, FL 33301

Last Updated 01/11/2021 08:01 PM
Project Title

Fiveash Water Treatment Plant Backwash Pump Conversion

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project is located at the Fiveash Water Treatment Facility, in the City of Fort Lauderdale. The work to be accomplished under this contract includes, but is not limited to, replacement of a 4160V pump motor with a 480v 150hp pump motor, installation of a transformer and starter, installation of new conduit and wire and performance testing and start up services.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents