Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

SFSR Overlay and Chip Seal project on the Payette National Forest
Alteration
Design
$1,000,000 to $5,000,000 est. value
McCall, ID 83638

Harding Street Pedestrian Connection
Infrastructure
Bidding
$780,000 est. value
Boise, ID 83705

Benewah Creek Road Safety Improvements
Infrastructure
Bidding
Less than $250,000 est. value
ID

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Main Street Sidewalk ADA Ramps
Alteration
Post-Bid
Lapwai, ID

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

For the Work of Performing Preventative Pavement Maintenance on All State Roads in Power County
Infrastructure
Post-Bid
$2,500,000 to $5,000,000 est. value
ID

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

2022 Road Improvement Projects
Infrastructure
Post-Bid
Hayden, ID 83835

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Warranty Double Chip Seal Coat
Infrastructure
Post-Bid
Lewiston, ID

Reported 06/24/2022 12:00 AM
Project Title

RFQ Contractor - 45th East Roadway Widening Project

Physical Address View project details and contacts
City, State (County) Ammon, ID 83401   (Bonneville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of widening approximately 3 miles of 45th East from 1st Street to 49th North, upgrading two existing roundabouts (1st Street and Lincoln Road), and constructing a new roundabout (Iona Road). To accommodate construction funding availability, this project may be divided into phases, as determined at the sole discretion of the owner. The roadway widening varies from increasing the existing 2 lanes to 5 lanes from 1st Street to Lincoln Road and to 3 lanes from Lincoln Road to 49th North. The project includes new curb, gutter, sidewalk, and a new storm drainage system along with other improvements to signing, striping, lighting, and other miscellaneous roadway features.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents