Similar Projects
Phosphorus Removal Facility Upgrade
Renovation
Conception
$4,000,000 est. value
Watertown, SD

Signing and Delineation - Gravel Roads
Infrastructure
Conception
$1,507,000 est. value
McIntosh, SD

Public Safety Facility
Renovation
Design
Brookings, SD 57006

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Kitchen Remodel Watertown Operations Center Watertown SD
Renovation
Bidding
$150,000 est. value
Watertown, SD 57201

Grading, Rubbilize PCC, Asphalt Concrete Surfacing
Infrastructure
Bidding
$8,260,000 CJ est. value
Brookings, SD 57006

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Y-- (MATOC) for Design-Build Construction Services
New Construction, Renovation, Demolition
Post-Bid
$500,000 to $20,000,000 est. value

Install New Acoustical Ceiling, Light Fixtures and New Supply Air Diffusers, Federal Building, Aberdeen, SD
Renovation
Results
$25,000 to $100,000 est. value
Aberdeen, SD

GSA Region 8 South Dakota Small Project Delivery Job Ordering Construction Contract (JOCC)
New Construction
Results
$2,000 to $10,000,000 est. value

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

GA Apron Reconstruction Phase I, Aberdeen Regional Airport
Infrastructure
Pending Verification
$500,000 CJ est. value
Aberdeen, SD 57401

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$3,922,000 CJ est. value
Tyndall, SD 57066

Florence School Expansion - Florence School District 14-1
Addition, Demolition, Infrastructure
Design
$5,000,000 CJ est. value
Florence, SD 57235

Last Updated 09/28/2022 02:32 PM
Project Title

Construction of Closure of Stage 4 and Stage 5 and Finishing of South Portion of Stage 2 and Stage 3 Waste Cell No. 2 at Roberts County Landfill

Physical Address View project details and contacts
City, State (County) Sisseton, SD 57262   (Roberts County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $238,765 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of September 28,2022, project was awarded to ROUNDS CONSTRUCTION COMPANY, INC., awarded amount is $238,764.64.** The work in accordance with Contract Documents, Plan Drawings and Specifications prepared by Holton Engineering, Inc., 128 E Hickory Str., P.O. Box 68, Sisseton, SD 57262-0068, consisting of the following major work. The Construction of Closure of Stage 4 and Stage 5 and finishing the Closure of Stage 2 and Stage 3 as per Specifications and Plan Drawings. Bid Proposals shall be submitted on forms furnished for that purpose. Prospective Bidders and subcontractors, or a Contractor can contact the Office of Holton Engineering, Inc. on an individual basis with questions or a visit to the Landfill where the construction will be done or by Contacting Randy Deutsch Landfill Manager to show the location of Waste Cell No.3 where it will be Constructed. The phone No. at the Landfill is 605-698-7362. The Landfill is closes at 3:30 P.M. Monday thru Saturday afternoon. The surety company thereon duly authorized to do business in the State of South Dakota, such Bid Bond to be a guarantee that the bidder will not, without the consent of OWNER, withdraw his Bid for a period of thirty (30) days, after the opening of bids, and, if awarded a contract, will enter into a contract with OWNER and the amount of the bond enforced by the OWNER in case the bidder fail to do so. All bid securities except those of the three (3) lowest bidders will be returned within five (5) days after the opening of bids. The Bid Security of the three (3) lowest bidders bill be retained until the contract is execute, but in no event longer than thirty (30) days, provided the Bid Security of the lowest responsible bidder shall be retained in any event until the contract is executed and Performance and Payment Bond furnished as herein provided. No bidder shall without consent of the OWNER, withdraw their bid for a period of thirty (30) days after the date for the opening thereof. The bid of the lowest responsible bidder will be accepted on or before the expiration of thirty days after the date of the opening of bids. The Owner, however, reserves the right to reject any or all bids and to wave any minor irregularities, informalities or discrepancies.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents