Similar Projects
Traffic Management System Installation
Infrastructure
Conception
$800,000 CJ est. value
Tower, MN 55790

Clure Public Marine Terminal - Duluth Seaway Port Authority
Infrastructure
Design
$10,500,000 CJ est. value
Duluth, MN 55802

2022 King Road Lift Station
Renovation, Infrastructure
Bidding
$520,000 CJ est. value
Orr, MN 55771

Breitung McKinley Park Trail
Infrastructure
Bidding
$412,420 CJ est. value
Tower, MN 55790

Forestry R2 NE Region Ground Site Preparation and Release
Post-Bid
Aitkin, Cloquet, Deer River, Hibbing, Littlefork, Tower, Two Harbors, MN

Scientific Drilling Operations
Infrastructure
Post-Bid
Soudan, MN 55782

Wastewater Treatment Facility Mercury Removal Improvements
New Construction
Results
$12,800,000 est. value
Babbitt, MN

Household Hazardous Waste Site Grading and Pavement Improvements
Infrastructure
Results
Duluth, MN

Hangar 101 Demolition and Development - Phase 1
Demolition, Renovation, Infrastructure
Construction
$388,236 CJ est. value
Duluth, MN 55811

Zentih Tiny Home Neighborhood
New Construction, Infrastructure - 19,250 SF
Pending Verification
Duluth, MN 55806

333 Tower Mixed-Use
New Construction, Infrastructure - 20,000 SF
Pending Verification
$75,000,000 CJ est. value
Duluth, MN 55802

Range Regional Airport Industrial Facility Expansion
Addition, Demolition, Infrastructure - 60,000 SF
Bidding
$20,000,000 CJ est. value
Hibbing, MN 55746

WLSSD Wastewater Treatment Facility
New Construction
Post-Bid
Duluth, MN

Pre-CHP - Mist Elimination Improvements
Renovation
Results
Duluth, MN

NorthMet Project
New Construction, Infrastructure
Pending Verification
$1,000,000,000 CJ est. value
Hoyt Lakes, MN 55750

Last Updated 09/08/2022 03:55 PM
Project Title

Water Treatment Plant - City Of Gilbert

Physical Address View project details and contacts
City, State (County) Gilbert, MN 55741   (Saint Louis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2021
Bids Due View project details and contacts
Estimated Value $120,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to include : Improvements to its water treatment plant and protect the city's water supply and meet OSHA requirements. As of May 3, 2021, the project is in early planning. An engineer has been selected but general contractor information is unknown. There is no construction timeline at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents