Similar Projects
2021 Preventive and Critical Lining
Bidding
$3,600,000 to $4,000,000 est. value
Denver, CO 80202

North Public Road Sanitary Sewer Main Extension
Post-Bid
Lafayette, CO 80026

Sand Traps - On-Call Single Trade Services
Post-Bid
Denver, CO 80202

35th Street and Lincoln Park Sanitary Improvements
Results
Less than $2,015,784 est. value
Denver, CO 80202

2019 Sanitary Sewer Improvements
Results
Less than $1,000,000 est. value
Lakewood, CO 80228

Candelas Community Commercial Parcels, Candelas Medical Phase 2 Utilities Project
Post-Bid
Arvada, CO

Ridge Gate Happy Canyon Trunk Sanitary Sewer
Results
Lone Tree, CO

Quarterly Grease Trap Pumping
Post-Bid
Florence, CO 81226

23 Road Sewer Trunk Line Extension Project
Results
Less than $500,000 est. value
Grand Junction, CO

2019 Manhole Rehabilitation
Post-Bid
Sterling, CO 80751

Miller Sanitary and Reuse Pipelines
Results
Less than $1,427,052 est. value
Lafayette, CO

Installation of The A-12 to A-12A-2 Sanitary Sewer Replacement
Post-Bid
Aspen, CO 81611

Leon Sreet Sanitary Sewer Project
Results
$30,000 est. value
Delta, CO

2020 Sewer Trenchless Point Repairs
Post-Bid
Salida, CO 81201

2020 SACWSD Wastewater System Rehabilitation
Results
Commerce City, CO 80022

Last Updated 01/07/2021 04:32 PM
Project Title

2020 Cured-In-Place Pipe Project

Physical Address View project details and contacts
City, State (County) Pueblo West, CO 81007   (Pueblo County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Application of epoxy cured in place pipe at various locations. Furnishing all labor, equipment, materials, and incidentals required to rehabilitate existing sewer mains by the installation of cured-in-place pipe (CIPP) into the existing main. Work will include bypass pumping, sewer cleaning, closed circuit television (CCTV) inspection of sewers to be lined, installation of liner, reconnection of service connections, final closed circuit television (CCTV) inspection, and all other related work. All such work shall comply with these specifications and the specific product manufacturer’s recommendations. Any conflict between the product manufacturer’s recommendations and any portion of the contract documents shall be resolved with the Owner prior to proceeding with the work

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utility Distribution Piping, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents