Similar Projects
DMDF Vertical Expansion
Term Contract
Design
Chicago, IL 60617

Drainage Improvement on Various State Maintained Routes
Infrastructure
Bidding
Glendale Heights, Lemont, Mount Prospect, IL

(296-Ft) Removal and Replacement of Culvert Located on Dixie Hwy over Ditch (1 Mile N of US 6)
Infrastructure
Bidding
IL

Culvert Repairs
Post-Bid
Palos Hills, IL 60465

Drinking Water Reservoir Cleaning and Inspections
Term Contract
Post-Bid
Oak Park, IL

Small Streams Maintenance
Results
Less than $4,550,000 est. value
IL

Roadway Reconstruction, Box Culvert Replacement, and Constructon of a Soldier Pile Retaining Wall under the I-294 Bridge
Results
Franklin Park, IL

(200-Ft) Wingwall Replacement and Culvert Repairs of the Culvert Carrying Wolf Road Over Addition Creek
Infrastructure
Bidding
$400,000 est. value
Northlake, IL 60164

Laurel Street Culvert Replacement
Post-Bid
Elgin, IL 60120

West Bartlett Drainage Improvements
Results
Bartlett, IL

Roadway Drainage - Landscape Improvements - Bridge Modifications
Renovation, Infrastructure
Bidding
$200,000 est. value
Thornton, IL

Willow Walk Subdivision Drainage Improvements
Post-Bid
Arlington Heights, IL

Grassland Regional Flood Control Pond Expansion
Results
Orland Park, IL

Willow Road Outfall Improvements
Infrastructure
Post-Bid
Winnetka, IL 60093

Streambank Stabilization on Calumet Union Drainage Ditch
Results
$2,351,738 to $2,846,840 est. value
Markham, IL 60428

Reported 04/19/2022 12:00 AM
Project Title

2022 Drainage Improvements

Physical Address View project details and contacts
City, State (County) Countryside, IL   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $47,800
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Includes rear yard drainage improvements at 5334 - 5340 7th Avenue, consisting of fence (wood and chain link) removal and replacement; storm sewer and drainage structure installation; grading and shaping ditches; and complete restoration, including topsoil, sod, and decorative stone removal and replacement.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents