Similar Projects
Amanda Rochell Elementary School Replacement
Renovation
Conception
Rockwall, TX 75032

New Elementary #8 Construction
New Construction
Conception
$44,200,000 est. value
Royse City, TX

Dutch Bros. Coffee
New Construction - 950 SF
Design
Less than $500,000 CJ est. value
Rockwall, TX 75032

Chipotle
Build-Out - 2,470 SF
Design
$400,000 est. value
Royse City, TX 75189

FM 2642 - Widen Road - Add Lanes
Infrastructure
Bidding
$28,420,108 CJ est. value
Royse City, TX 75189

Fate Pump Station No. 3
Infrastructure
Bidding
$16,000,000 CJ est. value
Fate, TX 75087

Royse City High School Vo-Ag Renovations
Infrastructure, Renovation - 13,796 SF
Sub-Bidding
$2,900,000 CJ est. value
Royse City, TX 75189

Royse City Independent School District (RCISD) Elementary School #7
New Construction, Infrastructure - 103,000 SF
Post-Bid
$10,000,000 CJ est. value
Royse City, TX 75189

Royse City Independent School District (RCISD) Elementary School #7
New Construction, Infrastructure - 103,000 SF
Post-Bid
$10,000,000 CJ est. value
Royse City, TX 75189

Rockwall Technology Park Phase V Infrastructure
Infrastructure
Results
$20,000,000 to $25,000,000 est. value
Rockwall, TX 75032

Sabine Creek Wastewater System Sabine Creek Wastewater Treatment Plant - Expansion to 7 MGD
Addition, Demolition, Infrastructure
Results
$69,831,000 CJ est. value
Royse City, TX 75189

Rosini Winery
New Construction - 2,891 SF
Construction
$750,000 est. value
Rockwall, TX 75032

Tiff's Treats
Renovation - 1,721 SF
Construction
$150,000 est. value
Rockwall, TX 75032

Middle School #4 - 2021 Bond - Proposition A - Rockwall Independent School District
Renovation
Pending Verification
$43,000,000 CJ est. value
Rockwall, TX 75087

Platform Rockwall
New Construction, Infrastructure - 77,234 SF
Pending Verification
$17,000,000 CJ est. value
Rockwall, TX 75087

Last Updated 12/23/2022 04:03 AM
Project Title

Linda Lyon Elementary Classroom Addition

Physical Address View project details and contacts
City, State (County) Heath, TX 75032   (Rockwall County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) Elementary School, Food/Beverage Service, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $4,513,138 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

"As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information". Addition; - 11,000 SF classroom addition, which is a storm shelter. - Single story - Structural CMU - Slab on void Renovation; - 2,500 SF interior renovation of existing dining area Provide a complete and tested Structured Cabling System (SCS) for the interconnections of the Local Area Network (LAN). The SCS shall include fully terminated unshielded twisted pair cables, fiber optic cabling, raceways, conduit, back boxes, copper/fiber optic termination components, station mounting hardware, fiber optic enclosures, patch panels, copper/fiber optic patch cables, relay cabinets/cabinets, and other incidental and miscellaneous premises wiring system hardware as required for a complete, tested, and usable system that is in compliance with the latest NEC, ANSI/EIA/TIA, BICSI, and Authorities Having Jurisdiction codes and standards. The installation shall comply with all applicable requirements, design guidelines, and standards in effect at the job site and as indicated in the Drawings and Specifications. 2. An IDF will be required when the distance between outlet termination classrooms and MDF/IDF exceeds 280, including service loops. IDFs shall be selected and organized to be minimum in number while still reaching all locations to be wired. 3. If there are any discrepancies between the drawings and specification or among themselves, the Contractor shall request clarification prior to providing pricing for the scope of work. If a request is not issued and a response not provided via a posted addendum, the Contractor shall provide pricing for the most costly scenario and obtain clarification during the course of the project. 4. These documents are conceptual in nature. It shall be the responsibility of the approved installer to furnish a complete and functional system, including the items shown on the drawings, in the specifications, and items not designated in either. The installer’s shop drawings and product data submittals shall represent a complete system and documents accepted do not relieve the installer from being required to provide any materials, equipment, or labor to furnish a complete and functional system as recognized by the Project’s Technology Consultant and the Owner. Bid Results Demolition Demo Company 24650 Earthwork RPMx 154627 Erosion Control Maint NSB 6150 Pressure Washing NSB 1650 Fence Titan 21828 Termite Treatment Texoma 800 Site Utilities Wildstone 268884 Landscape Texas Yard Pro 67300 Temp Seeding NSB 2150 Respread Topsoil NSB 5360 Irrigation Sleeves Nova 1850 Concrete RTD 715200 Spray Lock Sealer Vector 17640 Masonry Artisan 398890 Grade Maintenance NSB 4625 Structural Steel SCS 441785 Perimeter Protection NSB 2570 Millwork/Casework JC Millwork 83000 Roofing Precision 145000 Waterproofing CHM 49910 Doors/Frames/Hardware WBH 107302 Storefront / Glass Lindsay 209104 Water Testing NSB 3225 Drywall/Acoustical Vadens 200000 Ceramic Tile One Source 57323 Resilient & Carpet One Source 76809 Floor Protection NSB 3150 Painting Posadas 33393 Display Surfaces Spectrum 24921 Signage Casteel 4669 Toilet Partitions & Accessories Spectrum 13472 Fire Extinguishers Spectrum 1203 Window Treatment Powell 1569 Fire Sprinkler EFS 40000 Plumbing Atmac 355000 HVAC CMS 362583 HVAC Equipment Lennox 105490 Electrical Leland 389200 Data Cabling Peak Up Time 16388 Classroom AV Pro Computing 35864 Clock/Intercom/Phone Master AV 28604 Fire Alarm DAS 30000

Details

11,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Institutional Furniture, Classroom Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents