Similar Projects
Kitchen Hoods and Ducts Cleaning
Post-Bid
Dover, DE 19902

Maintain Industrial Water Treatment for High Volume HVAC Systems
Post-Bid
Dover Air Force Base, DE

Agricultural Compliance Laboratory - Air Handling Unit Replacement
Results
Dover, DE 19901

HVAC Design and Install at Weyandt Hall
- 36,000 SF
Results
Dover, DE 19901

Water Treatment for HVAC Systems
Term Contract
Post-Bid
Dover AFB, DE

Caesar Rodney School District - HVAC/Plumbing Renovations-3 Schools
Results
Camden, Camden Wyoming, DE 19934

HVAC Duct Cleaning And Mold Abatement BPA
Alteration
Post-Bid
Dover, Dover Air Force Base, DE 19902

Smyrna Readiness Center AHU`S and CU`S Replacement
Alteration
Results
Smyrna, DE

Terry Campus Roof and AHU`s Replacement
Alteration
Post-Bid
Dover, DE 19904

Ghert Building Gas Conversion
Alteration
Results
Dover, DE

Early Childhood Education Center Cafeteria HVAC Unit Replacement
Alteration
Post-Bid
$619,000 est. value
Greenwood, DE 19950

Red Clay Consolidated School District - Chiller Pre-Purchase
Alteration
Results

Woodbridge Early Childhood Education Center Gym HVAC Renovations
Alteration
Post-Bid
$726,000 est. value
Greenwood, DE 19950

Warren-Franklin Hall HVAC Renovation
Alteration
Results
Dover, DE

HVAC System Modernization
Alteration
Post-Bid
Dover, DE 19904

Reported 06/15/2022 12:00 AM
Project Title

Dover SB MACC D/B Renovate HVAC System at Building 515

Physical Address View project details and contacts
City, State (County) Dover Air Force Base, DE   (Kent County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids. Owner to Subcontract by Invitation Only.
Project Status Accepting Qualifications, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The general statement of work is to renovate the HVAC system in building 515 (B515). This project will involve replacement of multiple systems in Building 515 to include the Heating Ventilation and Air Conditioning system (HVAC) and interior finishes. This will include all design and construction work needed to convert the existing HVAC system to a 4-pipe system (Hot Water and Chilled Water) with variable air volume (VAV) Controls. This will include replacement of all legacy Pneumatic and Direct Digital Controls (DDC). $1-5 Million.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents