Similar Projects
Continental Mill Riverwalk Path
Infrastructure
Conception
$391,000 est. value
Lewiston, ME

Main Street Fire Station Replacement Project - City of Lewiston
Demolition, New Construction, Infrastructure
Conception
$4,002,093 CJ est. value
Lewiston, ME 04240

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Picker House Lofts
Infrastructure, Renovation
Design
$22,400,000 CJ est. value
Lewiston, ME 04240

Relocate Fuel Tank and Add Self-Serve Capabilities
Infrastructure
Bidding
$430,000 CJ est. value
Auburn, ME 04210

Ferry Road Roadway Improvements
Infrastructure
Post-Bid
$430,000 est. value
Lisbon, ME 04250

Hot Mix Shimming and Surface Paving
Infrastructure
Post-Bid
$250,000 est. value
Turner, ME

Intersection Improvements
Results
Auburn, ME 04210

Statewide Geotechnical Drilling
Infrastructure
Results

Strawberry Avenue Self-Storage
New Construction, Infrastructure - 28,400 SF
Pending Verification
$3,000,000 CJ est. value
Lewiston, ME 04240

Residence at Great Falls
New Construction, Infrastructure
Pending Verification
$40,000,000 CJ est. value
Lewiston, ME 04240

Canal Street Parking Garage Building Repairs - City of Lewiston
Renovation, Infrastructure
Conception
$600,000 CJ est. value
Lewiston, ME 04240

Walgreens - Main Street / Lewiston
New Construction, Infrastructure - 3,834 SF
Design
$825,000 CJ est. value
Lewiston, ME 04240

Paving and Catch Basin Improvements at Family Development
Infrastructure
Post-Bid
$1,500,000 CJ est. value
Auburn, ME 04210

McMahon Parking Lot
Infrastructure
Results
Lewiston, ME 04240

Last Updated 08/17/2023 10:25 AM
Project Title

Vale Street Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Lewiston, ME 04240   (Androscoggin County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected February 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $308,393 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the VALE STREET SIDEWALK IMPROVEMENTS shall consist of, but not be limited to, furnishing and installing (except as noted) all materials labor and equipment necessary to resurface or rehabilitate streets or roads as listed, including utility cover adjustments: water gate box lowering and raising, tack coat, shim, and overlay; driveway preparation and lawn and driveway restoration; pavement removal, common excavation, aggregate base gravel; erosion and traffic control and cleanup. No Proposal will be considered unless it is accompanied by a bid security in the form of a bid bond or certified check in the amount of ten percent (10%) of the total bid price, made out in favor of the City of Lewiston. All bid securities will be released upon deliverance of a signed Contract or, if no Contract award is made, within forty-five (45) days after the opening of the Proposals, unless forfeited as herein stipulated. A Performance Bond and a Labor and Material Payment Bond, preferably executed on AIA Bond Form Number A311, in an amount equal to the total Contract price, of a surety company satisfactory to the Purchasing Agent, will be required of the successful bidder to ensure completion of the work and the proper fulfillment of the conditions of the Contract. The total Contract price shall mean the total bid price as stated in the Proposal based on the estimated quantities of the various items of work. Questions and Requests for Information shall be submitted to Justin Bisson (jbisson@lewistonmaine.gov) on or before noon, July 13, 2023. The City reserves the right to negotiate with the low bidder to bring projects down to within budget. The scope of work for this program, shall consist of, but not be limited to, furnishing and installing (except as noted) all materials labor and equipment necessary to resurface or rehabilitate streets or roads as listed, including: utility cover adjustments: water gate box lowering and raising, tack coat, shim, and overlay; driveway preparation and lawn and driveway restoration; pavement removal, common excavation, aggregate base gravel; erosion and traffic control and cleanup. Scope: Remove existing pavement and curb. Saw cut and remove 5' of roadway on South Side, install new sidewalk adding 6" of MDOT Type A gravel. Saw cut and remove 18" of pavement to install new concrete curb on North Side of Vale Street. Remove 6" of existing gravel on North Side, and replace with 6" of new MDOT Type A Gravel. Adjust catch basins to proper height. Install new slip-form concrete curb. Fine Grade sidewalks and driveways. Place 9.5 mm HMA at 2" in one lift. Install new detectible warning plates. Perform lawn repair as needed

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents