Similar Projects
Plastic Polyethylene Tubing (NSG)
Term Contract
Sub-Bidding
Chicago, IL 60604

Electrical Supplyhouse
Term Contract
Post-Bid
IL

55 Gallon Steel Drums
Term Contract
Post-Bid
Less than $25,000 est. value
River Forest, IL 60305

Walk Thru Metal Detectors (WTMD)
Results

2022 Pool Mechanical Equipment Replacement
Alteration
Results
Oak Lawn, IL 60453

HVAC Supplyhouse
Term Contract
Post-Bid
Less than $25,000 est. value
River Forest, IL 60305

Generator And Uninterruptible Power Supply System At Metra`s Consolidated Control Facility
Alteration
Results
Chicago, IL 60607

Lumber and Hardware Supplyhouse
Term Contract
Post-Bid
Less than $25,000 est. value
River Forest, IL 60305

Howard Street Bridge Flag Pole Installation
Addition
Results
Niles, IL 60714

Waterjet Machining Center
Term Contract, Alteration
Post-Bid
Chicago, IL 60677

Air Room Pallet Racking
Renovation
Results
$42,915 CJ est. value
Chicago, IL 60609

Vibratory Asphalt Roller
Alteration
Post-Bid
Chicago, IL

Lane Tech High School Projector Install
Alteration
Results
$125,000 est. value
Chicago, IL 60618

Purchase and Installation of Park Shade Structures
Alteration
Post-Bid
Morton Grove, IL

Senn High School - Dectron Replacement
Renovation
Results
$237,735 CJ est. value
Chicago, IL 60660

Last Updated 07/25/2023 02:51 PM
Project Title

Waste Heat Recovery Chillers

Physical Address View project details and contacts
City, State (County) Lemont, IL 60439   (Cook County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

UChicago Argonne, LLC is seeking proposals for Waste Heat Recovery Chillers as part of the proposed 400 Area Waste Heat Recovery System Project. The project is a part of Argonne National Lab's (ANL) strategy to meet DOE's goals to improve resiliency, reduce energy intensity and greenhouse gas emissions. The Waste Heat Recovery System will be installed at Argonne National Laboratory, and is targeted to be commissioned by August 2024. In order to meet the project schedule and meet refrigerant requirements for the chillers, ANL is pre-purchasing the chillers. The Statement of Work (SOW) describes the specifications for the chillers and schedule, delivery, and other requirements that the manufacturer will be required to meet. Please see all applicable documentation listed below. Instructions to Bidders, dated 07/12/2023 (Review) Appendix "A" Argonne Terms and Conditions for Commercial Items and Services, ANL-71-COM, dated 02/13/2023 (Review and Accept) High Risk Work by Contractors on the Argonne Site Supplemental Conditions, ANL-366H, dated 06/23/2023 (Review and Accept) Statement of Work, 400 Area Waste Heat Recovery System, Waste Heat Recovery Chillers, dated 06/26/2023 (Review) Modular Waste Heat Recovery Chiller Schedule (Review) Drawing, 400 AREA WASTE HEAT RECOVERY SYSTEM, for reference only (Review) Specification, WATER-COOLED, SCROLL WATER CHILLERS, dated 06/23/2023 (Review) If able to provide this equipment please provide the following by 5:00 PM CST on 7/26/2023 Proposal Country of Origin Lead Time Reps & Certs, ANL-70B, dated 06/06/2022 (Complete) Certificate of Insurance ANL-70 (Provide a signature on page 1)

Details

Division 11 - Equipment, Operation and Maintenance of Equipment, Vehicle Service Equipment, Maintenance Equipment, Unit Kitchens, Residential Equipment, Residential Appliances, Agricultural Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents