Similar Projects
Blueberry Hill Road A-007 - 24317 - Taos County
Infrastructure
Conception
$7,888,000 CJ est. value
El Prado, NM 87529

Electric Vehicle Charging Station
New Construction, Infrastructure
Conception
$200,000 CJ est. value
Red River, NM 87558

Livestock Well and Watering System
Infrastructure
Design
$160,000 CJ est. value
Ojo Caliente, NM 87549

Installation of Livestock Well, Livestock Pipeline, Drinking Troughs, Storage Tank and Solar Pumping Plant
Infrastructure
Design
$300,000 CJ est. value
Ojo Caliente, NM 87549

Carson National Forest Drinking Water Well Drilling Project
Infrastructure
Bidding
$100,000 CJ est. value
Taos, NM 87571

Carson National Forest Drinking Water Well Drilling Project
Infrastructure
Bidding
$100,000 CJ est. value
Taos, NM 87571

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Y--NM-Valle De Oro NWR-Water Control Wetland 1 & 2 On
Term Contract
Results
Albuquerque, NM 87105

New Terminal - Taos Regional Airport - Town of Taos
New Construction, Infrastructure
Pending Verification
$5,400,000 CJ est. value
El Prado, NM 87529

Electric Vehicle Charging Station
New Construction, Infrastructure
Pending Verification
$200,000 CJ est. value
Questa, NM 87556

Taos Plaza Electric Vehicle Charging Stations
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Taos, NM 87571

Lower Arroyo Hondo MDWCA Water System Improvements Project
Infrastructure
Post-Bid
$500,000 est. value
Arroyo Hondo, NM

Amorak Road Water Improvements Project
Infrastructure
Post-Bid
$598,000 est. value
Ranchos de Taos, NM 87557

Carson and Santa Fe Road Maintenance
Infrastructure
Post-Bid
$250,000 CJ est. value
Taos, NM 87571

Last Updated 02/08/2023 03:04 AM
Project Title

Las Acequias de Las Trampas Diversion Structure Replacement Project

Physical Address View project details and contacts
City, State (County) Trampas, NM 87521   (Taos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $176,241 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work under the Contract Documents may be generally described as follows: The Project work includes the following: control of water and irrigation demand, construction surveys, clearing, grubbing and demolition of existing dam, excavation and placement of compacted backfill (340 CY balanced onsite), excavation, stockpile, and placement of compacted channel bed material (124 CY balanced onsite), furnish and install 93 tons of structure rock and 21 tons of Class 'C' size rock, furnish and install structure logs and root wads, furnish and install 4 cubic yards of reinforced concrete, furnish and install 24" diameter water control gates and trash rack, furnish and install 50 linear feet of 24" diameter HDPE pipe, and 120 square yards of planting, seeding and stabilization. Clearing, grubbing and demolition of existing dam Compacted backfill, balanced onsite Excavate, stockpile, and place compacted channel bed material Furnish and install structure rock (see schedule of rock on sheet 4} Furnish and install Class 'C size rock (see schedule of rock on sheet 4) Furnish and install 24" diameter water control gates and trash rack Furnish and install 24" diameter HOPE Pipe Planting, seeding, and stabilizing Deduction for installing Ponderosa Pine structure logs & root wads in lieu of Douglas Fir Deduction for removal of Bid Item No. 8 - Excavate. stockpile, and place compacted channel bed material Deduction for furnishing and installing one (1) 24" diameter Waterman C-10 in leiu of Waterman C-20 Deduction for furnishing and installing 3/8" thick steel headwalls coated in epoxy' paint in leiu of reinforced concrete at heading and sluice structures (provide shop drawings) The CONTRACTOR shall commence Work upon receipt of a fully executed copy of this Agreement, but no later than March 1, 2023. All work will be substantially completed on or before May 15, 2023. The Work will be completed and ready for final payment in accordance with STANDARD TERMS AND CONDITIONS on or before June 30, 2023.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents