Similar Projects
North Decatur Road Roundabout Improvements
Infrastructure
Bidding
Decatur, GA 30089

2021 T-Splost Asphalt Paving
Post-Bid
Elberton, GA

Resurfacing on Nickville Road, Pulliam Mill Road, Deep Creek Road and Hewell Road.
Infrastructure
Post-Bid
GA

Paving Indefinite Quanity, Indefinite Delivery Contract
Results
$750,000 to $10,000,000 est. value
Albany, GA 317040302

2020 LMIG Paving
Results
Buford, GA 30515

Stormwater Design for Georgia Avenue
Infrastructure
Post-Bid
Hampton, GA 30228

T32-D3-Pavepres-SR 20 SR 81 Henry-109266
Results
GA

2020 LMIG Road Resurfacing
Term Contract
Results
GA

Citywide Water Service Replacement and Resurfacing
Results
Union City, GA

Paving Improvements
Results
Rosier, GA 30434

Rosebud Road at Brushy Fork Road Roadway Improvement
Results
Lawrenceville, GA 30024

Road Resurfacing Services
Results
Less than $792,460 est. value
Smithville, GA 31787

In-House Paving Project
Results
Less than $104,022 est. value
Dahlonega, GA

Street Resurfacing 2021
Results
Less than $3,694,614 est. value
Tucker, GA

2021 SPLOST Milling and Resurfacing of Various Streets in Commission Districts 3 and 4
Results
Atlanta, Dahlonega, Dunwoody, Hampton, Irondale, Jonesboro, LaFayette, Riverdale, Roswell, GA 30525

Last Updated 01/23/2022 08:14 AM
Project Title

Pavement Preservation and Maintenance Services - District 3

Physical Address View project details and contacts
City, State (County) GA   (Spalding County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

prep work, removal, installation and cleanup for Pavement Preservation and Maintenance Services defined in this ITB. The majority of the work will occur on the Interstate and State Route system. The Contractor shall supply labor, equipment, tools, means of transportation, traffic control, and incidentals to perform work in accordance to specifications, and to ensure a safe work environment for employees and the traveling public within the time schedule specified. Work under this ITB consists of furnishing all labor, materials, tools, equipment, means of transportation, and incidentals necessary to perform the services. Contractor must furnish equipment in good operating condition and operated by properly trained and qualified personnel. The Contractor must make a good faith effort to furnish the Department the fully operational equipment needed to perform Pavement Preservation and Maintenance Services at such time, and at such location(s) as directed by the Engineer. Prior to start of work, Contractor must inspect equipment to ensure the equipment is fully operational for the performance of its intended purpose. The Contractor will also be responsible for any traffic control, licenses, and permits required to satisfy the duties required herein

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents