Similar Projects
Parks and Recreation Building HVAC Upgrades
Post-Bid
Less than $497,592 est. value
Salt Lake City, UT 84104

SLCC TRC CT Dust Collector
Post-Bid
Salt Lake City, UT 84130

Residential HVAC Services
Term Contract
Results
Salt Lake City, UT 84114

HEB Southeast Tower Fume Hood Upgrade
Results
$1,521,698 est. value
Salt Lake City, UT 84112

Fire Station Hot Water System Re-Pipe
Post-Bid
Riverton, UT 84065

Performing Arts Building HVAC Upgrade - Design/Build
Results
Salt Lake City, UT 84112

Department of Labor - Combustible Dust Chambers
Post-Bid
Sandy, UT

MSB HVAC Maintenance for Residential Housing and Education
Term Contract
Results
Salt Lake City, UT 84112

Biology Building Fume Hood Upgrade
Post-Bid
Salt Lake City, UT 84112

DFCM Construction - Mechanical Contractors - Camp Williams Building 3030 HVAC
Results
$120,000 est. value
Bluffdale, UT 84065

Kitchen Vent Hood Inspection and Cleaning
Post-Bid
Sandy, UT 84093

HVAC Upgrades in Filter Room
Results
$2,000,000 est. value
Salt Lake City, UT 84121

Ingersoll Rand Compressed Air System Purchase and Install
Post-Bid

HVAC Preventative Maintenance and Repair Services
Results
Salt Lake City, UT 84111

SD 100 HVAC Inverter Replacement
Post-Bid
Salt Lake City, UT

Last Updated 10/14/2021 01:39 PM
Project Title

J041--660 - (S4) ** EMERGENT** Air Handler Repair Bldg 2 AHU Repairs

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84148   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contractor will provide all labor, equipment, and materials to repair Supply Fan #2 in the Bldg. 2 C-Wing Air Handling Unit. 2. Contractor will provide all labor, equipment, and materials to refurbish Supply Fan #1 in the Bldg. 2 C-Wing Air Handling Unit. 3. Contractor will balance both supply fans and conduct startup per manufacturer’s recommendations.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents