Similar Projects
Lift Station Bypass Pumps
Infrastructure
Bidding
OH

Ivystone Well Replacement Project
Infrastructure
Bidding
Homeworth, OH

Submersible Vertical Well Pump
Post-Bid
Dayton, OH

Panel Assemblies for KI Miami North Wells
Post-Bid
Dayton, OH

Secondary Pump Replacement Project
Results
Less than $427,000 est. value
Dayton, OH 45422

Cleaning and Redevelopment of Wells #3 and #8
Results
Less than $68,956 est. value
Xenia, OH 45385

Paul Brown Stadium City Water Booster Pump Replacement
Infrastructure
Bidding
$300,000 est. value
Cincinnati, OH 45202

Dpu/Iqa/Project Dry Basement
Post-Bid
Columbus, OH

Greenfield Levee Pump/Motor #2 Repair
Results
Bainbridge, Greenfield, OH 45612

Rough Vacuum Pumps for VF-6 and Building 301
Term Contract
Post-Bid
Cleveland, OH 44135

Mad River Wellfield - Well 3 Replacement
Results
Fairborn, OH 45324

Influent Screw Pump Installation
Infrastructure
Post-Bid
Chillicothe, OH

2020 Test Well Services
Results
Less than $490,000 est. value
Wapakoneta, OH

Bear Exhibit Redevelopment - Pump Station Installation
Infrastructure
Post-Bid
Toledo, OH 43609

PUB Water Treatment Plant Well Rehabilitation Project
Results
$597,200 est. value
Batavia, OH 45103

Last Updated 12/22/2021 12:25 AM
Project Title

Revitalization of Production Wells

Physical Address View project details and contacts
City, State (County) Cincinnati, OH   (Clermont County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents