Similar Projects
CDIS Site Demolition, Abatement, and Site Preparations - GPC
Infrastructure, Alteration
Bidding
Madison, WI 53706

Refuse Hideaway Landfill Sampling and Analysis Services
Term Contract
Bidding
WI

Timber Sales
Term Contract
Post-Bid
Hayward, WI

Pre-Demolition Asbestos Abatement City Owned Structures
Post-Bid
Mequon, WI 53092

Mold Abatement and Site Restoration Services
Term Contract
Results
Madison, WI

Statewide Asbestos Abatement Services
Term Contract
Results
Less than $150,000 est. value

Groundwater Treatment, Sampling and Monitoring Services
Term Contract
Bidding
De Pere, WI

Sludge Removal And Disposal
Term Contract
Post-Bid

West HS Abatement/Demolition
Results
Madison, WI 53726

Invasive Plant Control
Alteration
Bidding
WI

Courthouse Complex T & M
Term Contract
Post-Bid
Milwaukee, WI 53233

Le Phillips Memorial Library - Hazardous Material Abatement
Results
Eau Claire, WI 54701

Asbestos Abatement and Building Demolition
Demolition, Alteration
Bidding
Altoona, WI 54720

Invasive Plant Control 2021
Post-Bid
WI

2021 Time & Material Parks Facilities
Term Contract
Results
Milwaukee, WI

Reported 03/26/2022 12:00 AM
Project Title

Mold Remediation at 2002 Zeier Road

Physical Address View project details and contacts
City, State (County) Madison, WI 53704   (Dane County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Ceiling: Remove and discard all ceiling tiles and associated grid in all areas of the building. This includes the Sales area (15,000 SF) and Breakroom (500 SF). HEPA-vacuum and damp-wipe metal ceiling surfaces exposed after removal of ACT and in existing exposed ceiling areas. This includes decking, support beams/trusses, light fixtures, and any remaining exposed MEPs. Temporarily secure loose light fixtures installed at removed ACT to structural members. Remove drywall ceiling soffit in main Sales area (350 LF) 2. HVAC – General: HVAC cleaning to be completed immediately after the ceiling tiles are removed or at least before the final HEPA vacuuming of surfaces. 3. HVAC – AHUs: Clean rooftop air handler units’ (5) interior fiberglass insulation. HEPA-vacuum or insulation replacement is acceptable. Sanitize coils, drip pans, and condensate drain pipe. 4. HVAC – Ductwork: Remediate ductwork serving all areas of the building. Sheet metal ducts can be cleaned and sanitized using typical duct cleaning methods. Removal and replacement of flex duct serving areas where ceilings are to remain (Rooms 12, 13, 15, and restrooms) is required as flex duct cannot be adequately cleaned once mold is present. Flex duct in the Sales area and Breakroom can be removed with the ACT and drywall soffit. Duct cleaning should include HEPA vacuuming of all air return and air supply grilles and diffusers. As-builts of the existing ductwork locations and sizes are not available. Much of the ductwork is not visible as it’s above existing ACT. Provide bid off approximate quantities and marked-up drawings shown in Exhibit B included in this RFB. a. 40 supply and return grilles/diffusers and corresponding ductwork. Grilles/diffusers to be cleaned and returned to City of Madison. i. 9 grilles/diffusers in hard lid ceilings ii. 25 grilles/diffusers in ACT ceiling

Details

Division 02 - Existing Conditions, Mold Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents