Similar Projects
Museum and Art Center
New Construction, Renovation - 59,000 SF
Design
$30,000,000 est. value
Brattleboro, VT 467274

Grove Street Bridge Rehabilitation 2021
New Construction
Bidding
Rutland, VT

Green River Covered Bridge
New Construction, Infrastructure
Bidding
Guilford, VT

STP CVRT(2) - Winooski River Bridge and Bike Path Construction
Post-Bid
Montpelier, VT

Georgia BF 023-1(7)
Results
$1,000,000 to $2,500,000 est. value
Georgia, VT 05454

Hartland IM 091-1 (68)
Results
$1,000,000 to $2,500,000 est. value
Hartland, VT 05048

Fort Hill Bridge Removal, Stream Restoration and Route 15 Wildlife Passage Project
Construction
Less than $141,902 est. value
Williston, VT 05495

Warren Covered Bridge Rehabilitation Project
New Construction, Infrastructure
Bidding
$250,000 to $500,000 est. value
Warren, VT

Eden BO 1448 (44)
Results
$500,000 to $1,000,000 est. value
Eden, VT 05652

Main Street Pedestrian Bridge Project, STP BP 14(3) and STP BP 17(7)
Results
$300,000 to $500,000 est. value
Plainfield, VT

Moxley Bridge
Results
Chelsea, VT 05038

Hardwick BF 037-3 (8)
Term Contract
Results
$500,000 to $1,000,000 est. value
Hardwick, VT 05836

Hartford Im 091-2 (90)
Results
$1,000,000 to $2,500,000 est. value
New Haven, VT

Corbett Road Bridge
Results
Underhill, VT 05489

Brown Schoolhouse Road Pedestrian Bridge Replacement
Results
Norwich, VT

Last Updated 06/01/2021 08:26 AM
Project Title

Florence Bridge Installation

Physical Address View project details and contacts
City, State (County) Florence, VT 05744   (Rutland County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of two existing side-by-side corrugated steel tube road culverts with a precast concrete bridge structure on Fire Hill Road (T.H. # 21) in Florence, just west of the Troy Minerals Road. The bridge will be a pre-cast rigid frame and headwalls system which is supported on steel piles and cast-in-place concrete grade beams. The bridge will also have cast-in-place wingwalls and cutoff walls that will be toed to the pre-cast frame. The number of bridge sections will be determined by the pre-cast supplier (Camp Precast).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents