Similar Projects
East West Connector Roadway Safety Improvements - 2-217 - City of Smyrna
Infrastructure
Conception
$2,170,000 est. value
Smyrna, GA 30082

Windy Hill Parkway Improvements - 2-218 - City of Smyrna
Infrastructure
Conception
$1,230,000 est. value
Smyrna, GA 30080

South Cobb Drive Convenience Store
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Marietta, GA 30060

St. Benedict Episcopal School Middle School Classroom Building
New Construction, Infrastructure - 50,000 SF
Design
$7,000,000 CJ est. value
Smyrna, GA 30080

Repair Gca Rapcon Support Facility B557, Demo Obsolete Buildings and Concrete Structures B545 and 557b and C
Demolition, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Marietta, GA 30060

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

T32-D7-PCC-I285 MP3 to 17.5-130379
Infrastructure
Post-Bid

Site Improvements at Durham Park and Taylor-Brawner Park
Infrastructure
Results
Smyrna, GA 30080

T32-D7-PCC-District Wide-122083
Infrastructure
Results

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Construction
$48,000,000 CJ est. value
Powder Springs, GA 30127

Brownsville Road Mixed-Use Development
New Construction, Infrastructure - 12,000 SF
Construction
$48,000,000 CJ est. value
Powder Springs, GA 30127

Space Shop Self Storage / Marietta
Addition, Demolition, Renovation, Infrastructure - 33,800 SF
Pending Verification
$20,000,000 CJ est. value
Marietta, GA 30066

Kennesaw Crossing Storage
New Construction, Infrastructure - 138,000 SF
Pending Verification
$15,000,000 CJ est. value
Kennesaw, GA 30144

Greers Chapel Road Retail Development
New Construction, Infrastructure
Conception
$4,000,000 CJ est. value
Kennesaw, GA 30152

Noonday Creek Trail Extension FM SR 92 to Noonday Creek Park
Infrastructure
Design
$5,000,000 CJ est. value
Kennesaw, GA 30144

Last Updated 03/29/2023 11:02 AM
Project Title

Chattahoochee River Trail Pedestrian Improvements

Physical Address View project details and contacts
City, State (County) Marietta, GA 30060   (Cobb County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $3,432,539 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing All Labor, Material, Equipment and Other Things Necessary for the Complete Construction of: chattahoochee River Trail Pedestrian Improvements Project Description: This Project Will Construct a Multi-use Trail Beginning on the Southeast Side of Discovery Boulevard From the North Bank of Nickajack Creek and Extending Along the Riverbank Toward Veterans Memorial Highway. The Project Will Include Both Paved and Unpaved Trail Sections of Varying Widths From 6-feet to 14-feet, Timber Boardwalks, and Landscaping. The Approximate Length of the Project is 1.2 Miles. Project Duration: the Time Allowed for Performance of the Project Will Be 540 Days From Issuance of Notice to Proceed. Contractor Must Meet the Current Bid Requirements of the Georgia Department of Transportation. Contractor and Their Subcontractors Are Required to Be in Compliance With the "Georgia Security and Immigration Compliance Act." Cobb County Will Affirmatively Comply With Title Vi of the Civil Rights Act of 1964 and 78 Stat. 252, 42 Usc 2000d-42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle a, Office of the Secretary, Part 21 Nondiscrimination Act(S). Disadvantaged Business Enterprise (Dbe) Participation and Small Business Participation in All Dot Contracts is Encouraged. The Cobb County Board of Commissioners Reserves the Right to Reject All Bids and Waive Any Formalities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents