Similar Projects
Last Updated | 04/29/2022 08:17 AM |
Project Title | JBSA Lackland Air Handler Unit |
Physical Address | View project details and contacts |
City, State (County) | San Antonio, TX 78275 (Bexar County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor shall remove existing motor and blower assembly. Install 2 Geenheck Model Plenum fans (Vari-green EC motor, dial for balancing) or equal to. Contractor shall modify the electrical to accommodate the new motors for the AHU. Contractor shall retrofit new bower assembly, create a wall in the AHU, and blank off any gaps to create a discharge plenum to be installed. Contractor shall repair any items required for testing the operation of Air Handlers mechanically, and make necessary electrical modifications for new motors at Building 2000 rear mechanical room. Contractor shall supply the materials and service described in this document below. All work shall be conducted in compliance with the American Society of Heating and Air-Conditioning Engineers (ASHRAE) standards. This is a turnkey install and start up. Contract shall result in a fully operational system. 502 CE shall not provide any materials, tools or equipment. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |