Similar Projects
TVMDL (Former) - DM 2021 MEP
Post-Bid
College Station, TX 77843

Electrical Maintenance and Repair Services for the TxDOT Bryan District
Term Contract
Post-Bid
Bryan, TX 77803

Purchase of Electric Meter Pedestals
Results
College Station, TX 77842

Purchase of Steel Poles for Steele Store to Smetana 138KV Line
Term Contract
Results
Less than $1,302,308 est. value
Bryan, TX 77803

5D4m-Replace Hospital Power Lines
Post-Bid
$25,000 to $100,000 est. value

Overhead Transmission Construction
Term Contract
Results
Less than $552,999 est. value
Bryan, TX 77805

CSU Electric Underground Construction and Maintenance Contract
Term Contract
Post-Bid
$750,000 est. value
College Station, TX

First Phase Transformers
Term Contract
Results
Less than $358,770 est. value
Bryan, TX 956509

Transformer Testing and Maintenance on Switching Blades
Post-Bid
Falcon Heights, TX

UES Electrical Distribution Services
Results
College Station, TX 77845

Facility A/C Bacnet Repair
Post-Bid

Lighting Improvement Project
Results
Less than $996,199 est. value
College Station, TX 77845

CIP ROW FY22
Term Contract
Post-Bid
Bryan, TX

Three Phase Transformer Purchase Installation Spring Creek Substation
Results
College Station, TX 77842

Annual Price Agreement for Distribution Conductor
Post-Bid
College Station, TX 77842

Last Updated 04/16/2021 09:32 AM
Project Title

Texas Avenue Phase 1B - Overhead to Underground Conversion

Physical Address View project details and contacts
City, State (County) Bryan, TX   (Brazos County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,651,270
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project Consists of relocating approximately 1.8 miles of 477 AAC overhead electric distribution line on Texas Avenue from North Washington Avenue to Coulter Drive. The newly relocated distribution line will consist of a combination of overhead and underground construction. This bid will only include underground construction. The contractor will provide labor and equipment to install the following items: I. Approximately 1,100' of three (3) 4? HDPE conduit installed by directional bore. II. Approximately 1,500' of three (3) 4? and three (3) 2” HDPE conduit installed by directional bore. III. Approximately 200' of three (3) 4? and four (4) 2” HDPE conduit installed by directional bore. IV. Approximately 800' of one (1) 4? HDPE conduit installed by directional bore. V. Approximately 750' of six (6) 2” HDPE conduit installed by directional bore. VI. Approximately 1,100' of three (3) 2” HDPE conduit installed by directional bore. VII. Approximately 575' of two (2) 2” HDPE conduit installed by directional bore. VIII. Approximately 1,415' of one (1) 2” HDPE conduit installed by directional bore. IX. Approximately 6,000' of three (3) 4? Schedule 40 PVC conduit installed by trenching. X. Eight (8) 15 kV pad-mounted switchgears. XI. One (1) 200 Amp 15 kV three-phase pad-mounted junction boxes. XII. One (1) 15 kV single-phase pad-mounted junction boxes. XIII. Five (5) Three-Phase 1000 MCM Al 15 kV risers on new power poles installed by others. XIV. Eight (8) Single-Phase 1/0 Al 15 kV risers on new power poles installed by others. XV. Two (2) Two-Phase 1/0 Al 15 kV risers on new power poles installed by others. XVI. Twelve (12) Three-Phase 1/0 Al 15 kV risers on new power poles installed by others. XVII. Approximately 4,500' of three-phase 1000 MCM Al 15 kV primary cable with terminations. XVIII. Approximately 7,800' of three-phase 1/0 Al 15 kV primary cable with terminations.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents