Similar Projects
2019 Sanitary Sewer and Storm Sewer Rehabilitation (2019-10)
Results
Hershey, PA 17033

2020 Sewer System Improvements
Results
$2,000,000 to $2,900,000 est. value
Harrisburg, PA 17101

Maintenance and Emergency Repairs to the Wastewater and Stormwater Collection Systems
Results
Harrisburg, PA 17109

Southeast Sewer Extension
Results
$2,800,000 to $3,000,000 est. value
Harrisburg, PA 17110

2020/2021 Lining Project
Term Contract
Results
Harrisburg, PA 17109

Highway Inlets Boxes, Grates, Frames Supplement 2
Results
Harrisburg, PA 17102

2019 Sanitary Sewer and Storm Sewer Replacement Project (2019-09)
Results
Hershey, PA 17033

Maintenance and Emergency Repairs to Wastewater Collection System
Results
Harrisburg, PA 17110

2020 Sewer Replacement
Results
Royalton, PA 17057

2019 Sanitary Sewer System Improvement Project - Force Main Replacement
Results
Middletown, PA 17057

Mary Alley Sewer Replacement Project
Results
$145,000 to $185,000 est. value
Highspire, PA 17034

CCTV Inspection and Repair Project – Edgmont, Middletown and Rose Valley
Results
$870,000 to $970,000 est. value
Edgemont, Middletown, Rose Valley, PA

Arsenal Boulevard Sewer Improvements - Phase 1
Results
$2,300,000 to $2,700,000 est. value
Harrisburg, PA 17103

Holiday Park Sanitary Sewer Extension Project - Sewer and Force Main Construction
Results
$1,800,000 to $2,000,000 est. value
Harrisburg, PA 17111

2020 Sewer Replacement and Rehabilitation Project CIPP Lining
Results
Royalton, PA 17057

Last Updated 01/20/2020 03:34 PM
Project Title

2019 Sanitary Sewer System Improvement Project - General Construction

Physical Address View project details and contacts
City, State (County) Middletown, PA 17057   (Dauphin County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for this Contract consists of improvements to the Jamesway Pump Station, Green Plains Pump Station, and Middle School Pump Station; and the replacement of two (2) Parshall flume meter pits with new manholes. The scope of work generally includes, but is not limited to, replacement of existing force main; installation of two (2) force main by-pass connections; installation of a concrete flood wall and associated flood gate; installation of a dehumidifier; installation of a cantilever slide gate; installation of wet well aeration system; installation of an interior wall; installation and replacement of two (2) aluminum access hatches; installation of a sewage grinder; the demolition of two (2) existing Parshall flumes meter pits; installation of two (2) sanitary sewer manholes; installation of two (2) laserflow meters and associated controls; erosion and sedimentation controls; bypass pumping as needed; associated work; surface restoration; and all other work

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents