Similar Projects
RCCG Salvation Center San Antonio / 1406 Pinn Road
New Construction, Infrastructure - 30,700 SF
Design
$2,500,000 CJ est. value
San Antonio, TX 78227

7375 Somerset / Martinez - Barbacoa
New Construction, Infrastructure - 1,250 SF
Design
$150,000 CJ est. value
San Antonio, TX 78211

Westlakes FM 143 Water Main Extension
Infrastructure
Bidding
San Antonio, TX 78252

FY18 Vehicle Maintenance Shop, Camp Bullis
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
San Antonio, TX 78257

IH0035 - Installation of Flashing Beacons and Ped
Infrastructure
Sub-Bidding
$2,925,000 CJ est. value
San Antonio, TX 78208

Purchase of PVC C-905 Pipe
Term Contract
Sub-Bidding
San Antonio, TX 78205

Construction Bids for Approximately 3,200-Feet of 12-Inch Water Main Near Toutant Beauregard Road and Future Scenic Crest Blvd
Post-Bid
San Antonio, TX 78249

Settlers Ridge Sewer and Water main Replacement
Infrastructure
Post-Bid
Leon Valley, TX

Closed Loop Systems Water Treatment
Results
San Antonio, TX

Annual Contract for Valve Preventive Maintenance Services
Term Contract
Results
Less than $260,000 est. value
San Antonio, TX

Amazon Remodel Project UTX8
Demolition, New Construction, Infrastructure - 10,130 SF
Pending Verification
$1,695,000 CJ est. value
San Antonio, TX 78218

Texas Biomedical Research Institute Animal Care Complex
Addition, Demolition, New Construction, Infrastructure - 41,300 SF
Pending Verification
$10,000,000 CJ est. value
San Antonio, TX 78227

San Antonio Zoo Entry
Demolition, New Construction, Infrastructure - 14,000 SF
Design
$10,500,000 CJ est. value
San Antonio, TX 78212

RFQ Contractor - Fire Station 121 and Remodel of Training Hall
New Construction, Build-out, Infrastructure - 23,100 SF
Bidding
$3,550,000 CJ est. value
San Antonio, TX 78253

One-Time Purchase of Promage Electromagnetic Flowmeters
Term Contract
Sub-Bidding
San Antonio, TX 78205

Last Updated 08/05/2022 01:10 AM
Project Title

Zigmont Road 12-inch Water Main Project

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78101   (Bexar County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,417,387 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of 8/4/2022 no award has been made. Additional details on the award status will be made available following the August 2022 SAWS Board meeting. Sealed bids are requested by the San Antonio Water System for the construction of approximately 11,200 LF of 12-inch water main for the Zigmont Rd 12-inch water main Project For questions regarding this solicitation, technical questions or additional information, please contact Stella Manzello, Contract Administrator, in writing via email to: Stella.Manzello@saws.org or by fax to (210) 233-4290 until 4:00 PM (CT) on June 8, 2022. Answers to the questions will be posted to the site by 10:00 AM (CT) on June 15, 2022 as a separate document or included as part of an addendum. Please be advised that Bidders are prohibited from communicating with any other SAWS staff, the Consultant, the Developer, or City of San Antonio officials regarding this IFB up until the contract is awarded as outlined in the Instructions to Bidders. Electronic bids shall be accompanied by a bid bond in an amount not less than five percent of the total bid price. (Or, if providing SAWS with a cashier's check or certified check in an amount not less than five percent of the total bid price, SAWS will request this within 24 hours from the apparent low bidder. Sealed bids must be accompanied by a cashier's check, certified check, or bid bond in an amount not less than five percent of the total bid price. If Bidders intend to submit bids electronically, Bidders will need to submit a request by June 22, 2022 at 2:00 PM (CDT) to receive access to the File Transfer Protocol (FTP) site via email to Stella.Manzello@saws.org. Bidder's email requesting access to the FTP site shall provide the legal name of Bidder's company and the intended recipient's email address and phone number. No requests for FTP site access will be accepted after June 22, 2022 at 2:00 PM (CDT). SAWS Job 21-7001 a. Alignment: 12-inch diameter pipe- Starting at the tie-in location approximately 3,500 fit east of Bonnet Ln at an existing 8-inch waterline. Immediately crossing to the north side of Real Rd and proceeding east. At bend in road follow along west side of Zigmont Rd until approximately 2,200 ft north of Macaway Rd where waterline will cross to east side of Zigmont Rd. Waterline will continue north along east side of Zigmont Rd until reaching the intersection of FM 1346 and Zigmont Rd. Tie into an existing 12-inch waterline. Approximately 11,200 ft ofwaterline to be installed. 2. Verification oftie-in point: Contractor shall verify location and elevation of connection to existing 8-inch and existing 12-inch water line prior to ordering materials.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents