Similar Projects
Allegro of Noblesville
New Construction, Infrastructure
Conception
$83,000,000 est. value
Noblesville, IN 46060

Reconstruction of College Avenue - City of Carmel
Alteration
Conception
$250,000 est. value
Carmel, IN

New Fire Station
New Construction
Design
$7,100,000 est. value
McCordsville, IN

Intersection Improvement, Roundabout
Infrastructure
Design
$969,000 est. value
Noblesville, IN 46061

Continuous Diamond Grinding of Concrete Pavement
Infrastructure
Bidding
$400,000 CJ est. value
Fishers, IN 46038

Continuous Diamond Grinding of Concrete Pavement
Infrastructure
Bidding
$400,000 CJ est. value
Fishers, IN 46038

2021 Paving
Post-Bid
Carmel, IN

Mill and Resurface Various City Streets - 2020 Community Crossing Grant
Post-Bid
Carmel, IN

Asphalt Road Resurfacing and Miscellaneous Paving Work
Results
Fishers, IN 46038

Added Travel Lanes and Utility Relocation
Results
IN

iBeach31 at Grand Park
New Construction, Infrastructure - 20,000 SF
Pending Verification
$4,600,000 CJ est. value
Westfield, IN 46074

Pavement Replacement, HMA
Infrastructure
Conception
$890,000 est. value
Noblesville, IN 46061

HMA Overlay Minor Structural
Infrastructure
Design
$8,533,200 est. value
Noblesville, IN 46061

2022 Resurfacing Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Westfield, IN 46074

Hamilton Heights Pavement Improvements
Post-Bid
Arcadia, IN 46030

Last Updated 07/28/2022 11:12 AM
Project Title

City of Carmel Police Headquarters Expansion

Physical Address View project details and contacts
City, State (County) Carmel, IN 46032   (Hamilton County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Fire/Police Station, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $34,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project went before the city council's finance committee on January 21, 2021 to consider bonds. The committee is set to continue discussing the bonds and other proposed bonds at a future meeting. An architect has been selected, and the drawings are in the schematic stage. A bid schedule has not been determined. Construction is expected to start in summer 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents