Similar Projects
Pier 10 Redevelopment / Pier 10 and 12 Dock Repairs
Infrastructure
Bidding
Galveston, TX

Bulk Dock 2 Breasting Structure Repairs
Infrastructure
Bidding
Corpus Christi, TX

Hazel Bazemore Park Boat Ramp Rehabilitation Project Phase II
Post-Bid
Corpus Christi, TX 78401

Alabama Street Terminal Repairs - Phase II: Dock Fender Rehabilitation
Post-Bid
Orange, TX 77631

New Oil Dock 22 Marine Terminal
New Construction
Results
Corpus Christi, TX

Lake Limestone Park 5 Loading Dock
Results
Waco, TX 76714

Southeastern Freight Lines
Renovation
Construction
El Paso, TX 79907

Pier 39-40 Mooring Modifications
Infrastructure
Bidding
Galveston, TX

Lake Houston Boat Ramp Replacement Services
Post-Bid
Houston, TX 77251

Marina and Fishing Pier Accessibility Upgrades at Lake Livingston
Results
Less than $1,597,928 est. value
Livingston, TX 77351

Lake Nasworthy Fishing Pier
Alteration
Bidding
San Angelo, TX

Derelict Vessel Removal Services
Post-Bid
Austin, TX 78701

Construction of the Fulton Fishing Pier
Results
Less than $1,717,810 est. value
Fulton, TX 78358

Freshwater Mussel Survey and Aquatic Species Resource Relocation Services
Term Contract
Post-Bid
Waco, TX

Renovations at the Galveston Ferry
Results
Less than $4,001,242 est. value
TX

Last Updated 06/28/2021 08:41 AM
Project Title

Berth 10 Marine Improvements at Galveston Wharves

Physical Address View project details and contacts
City, State (County) Galveston, TX   (Galveston County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project contemplated consists of the following: 1) Demolition of existing slabs and beams in 20 locations; 2) Jet Probing of all pile foundations (116 places); 3) Construction of a total of 23 dolphins (8 different types) which includes: a. Material Procurement and Installation of the Dolphin Pipe Pile foundations (116 piles) b. Material Procurement and Installation of the Dolphin Reinforced Concrete Cap; 4) Procurement and Installation of Cast Steel Mooring Bollards: seven (7) 200-ton and seven (7) 100-ton; 5) Procurement and Installation of Foam Filled Fenders: seventeen (17) Extra High Capacity 7' x 14'; 6) Environmental Controls as required by the Conditions of the USACE permit.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents